Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Kier Transportation - CP7 NWC |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: |
| Open |
| Estimated Value (ex. VAT): | £50,000 |
| Release Date: | 27 August 2026 |
| Application Deadline: | 3 September 2026 |
| Contract Start Date: | 2 February 2027 (Estimated) |
| Contract End Date: | 17 April 2028 (Estimated) |
| Contract Duration: | 1.3 years |
| Procurement ID (OCID): | ocds-b5fd17-bf10bb83-a20f-4c2d-82ee-a43249a961da |
| Notice Reference: | fe55e276-5324-4eb6-b31f-f9922bb3d9d8-912256 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Installation, maintenance and removal of rail track protection. -Structural enabling and demolition works to an existing bridge structure. -Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials. -Careful removal and storage of existing coping stones and pilaster caps for potential reuse. -Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete. -Demolition and disposal of bridge structural elements in accordance with project requirements. -Working within a rail environment with compliance to all relevant safety and possession requirements."
Document pack· 1 file
Published contracts in the last 12 months
7
total contracts
£4.0m
total value
£564,286
average contract size
Typical categories
Manchester International Airport - Permanent Way Works
Kier Transportation - CP7 NWC · WAC-641092
Manchester International Airport - Steel Parapet Bridge Fascia
Kier Transportation - CP7 NWC · WAC-623941
Manchester International Airport - Precast Concrete Beams
Kier Transportation - CP7 NWC · WAC-623945
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
3 September 2026
8 days left
Estimated Value
£50,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →