Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | ASTER GROUP LIMITED |
| Main Category: | Works |
| Procurement Method: | Below threshold - limited competition |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 31 July 2026 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-06d848 |
| Notice Reference: | 072476-2026 |
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award status: | Active |
Project: The refurbishment of the main hipped roof • NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme. • As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works • Temporarily close off working areas to exclude vehicles and pedestrians from the site using suitable signage and remove them upon the re-opening on completion of the works. • Provide scaffolding/staging as required to the properties to enable safe access to undertake all works outlined within the schedule in accordance with Working at Height Regs. 2005. All scaffolding is to be erected, managed and dismantled in accordance with guidance of NASC - SG4 and Design should be in accordance with NASC - TG20:21. • Allow to remove existing roof covering in accordance with current asbestos management guidelines clearing all resultant debris from working area before starting to build and fix the ladders, fit the deck and install new plastics as per the pricing document Page 5 of 15 • The contractor shall review the asbestos R&D supplied and manage a specialist asbestos removals contractor to undertake the removal and disposal of any hazardous waste material. • Ensure that the removal of the existing roof covering including ACM sheets and all plastics inc guttering is compliant with current regulations. The removals contractor must have UKATA/IATP training qualifications for any unlicensed removals and provide consignment note upon completion of works. • Make and supply “ladders” fitted over concrete beams to provide fall of at least 5 degrees to the rear of the garages • Remove the all existing, soffits, facia and guttering including any associated fixtures and install the deck or waterproof covering with associated fixtures & fittings • Install new fascia around the building to conceal the roof ladders as well deepflow gutter with appropriate clips and fittings to the rear. Also supply and fit appropriate downpipe, with appropriate clips and fittings, to the rear of the property with a minimum 2 down pipes and all clips to be a maximum 1 metre apart
Published contracts in the last 12 months
86
total contracts
£451.6m
total value
£13,684,319
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →