| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | DfI Transport and Road Asset Management (TRAM) |
| Main Category: | Works |
| Procurement Method: | Below threshold - open competition |
| Tender Status: | Pre-tender |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£1,600,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £1,600,000 |
| Estimated Value (inc. VAT): | £1,920,000 |
| Release Date: | 31 July 2026 |
| Application Deadline: | — |
| Enquiry Deadline: | 3 September 2026 |
| Contract Start Date: | 11 October 2026 (Estimated) |
| Contract End Date: | 23 November 2026 (Estimated) |
| Contract Duration: | 1 month |
| Procurement ID (OCID): | ocds-h6vhtk-06d948 |
| Notice Reference: | 072907-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Delivery of a carriageway resurfacing scheme on a 4.35km section of the A4 Annaghilla Road, between Ballygawley and Augher. The scheme comprises the milling and removal of the existing surface course and binder course with the construction of a new Hot Rolled Asphalt (HRA) surface course. Existing carriageway levels and profiles are to be maintained throughout the works. The extent of the works is generally confined to the existing carriageway footprint. The works may also include regulation of existing pavement layers and/or localised replacement of the binder course where identified within the contract documents. The objective of the project is to restore the structural and functional condition of the carriageway through the replacement of the existing deteriorated surfacing while maintaining the existing road geometry and levels. The successful Contractor will be required to undertake all construction activities necessary to complete the resurfacing works, including traffic management, milling, pavement repairs, surfacing operations, iron work reinstatement, road markings, associated ancillary works and all testing and quality assurance requirements specified within the contract documentation. The contract will be delivered under the NEC4 Engineering and Construction Contract (ECC) Option B. Scope of Works includes the following: A. Provision and maintenance of traffic management arrangements. B. Milling and removal of the existing surface course and binder course layers C. Regulation and/or localised binder course replacement as detailed in the contract documents. D. Laying of new Hot Rolled Asphalt (HRA) surfacing and binder course . E. Reinstatement and adjustment of iron work. F. Reinstatement of road markings and other affected highway features. G. Completion of all associated testing, quality assurance and health and safety requirements.
Document pack· 1 file
Published contracts in the last 12 months
73
total contracts
£1918.5m
total value
£56,427,355
average contract size
Typical categories
DfI TRAM - Supply of 2 no. 4X4 Wheeled Loaders
DfI Transport and Road Asset Management (TRAM) · WAC-632628
DfI TRAM T-1171 Interim Surfacing Contract 2026 - ISCW1 Dungannon
DfI Transport and Road Asset Management (TRAM) · WAC-622994
DfI TRAM T-1170 Interim Surfacing Contract 2026 - ISCS1 Down
DfI Transport and Road Asset Management (TRAM) · WAC-623007