Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Northern Lighthouse Board |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£550,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £550,000 |
| Estimated Value (inc. VAT): | £660,000 |
| Release Date: | 24 July 2026 |
| Application Deadline: | — |
| Contract Start Date: | 30 September 2026 (Estimated) |
| Contract End Date: | 1 March 2027 (Estimated) |
| Contract Duration: | 5 months |
| Procurement ID (OCID): | ocds-h6vhtk-06d2bc |
| Notice Reference: | 070043-2026 |
All 2 notices for this procurement, oldest first.
NLV Pharos Dry Dock Services 2027
NLV Pharos Dry Dock Services 2027
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
The Northern Lighthouse Board (NLB) require Dry Dock Facilities for NLV Pharos to carry out 20 year Special survey works This will include essential works and surveys to meet the Classification Society/Flag state requirements for certification of the vessel. Total estimated timescales for the duration required for the works are 4 weeks, with dry dock works being 3 weeks within this. The services will be provided by both the dry dock facility and external contractors, access will be required for NLB staff and NLB prearranged appointed contractors. Locations within the United Kingdom and Europe will be considered. A full description of the requirements will be detailed within the tender documents available to download from https://www.delta-esourcing.com, once published. Estimated dates for Dry Dock: Arrival Date - 28th January 2027 Layby berth Dry dock works - 1st February - 23rd February 2027 (layby berth) Departure Date: 28th February 2027 Potential suppliers should provide dates that their drydock is available, noting the approximately 4 week required duration for the works. These are the preferred dates but may be flexible to meet drydock availability. We are inviting expressions of interest from suppliers who can provide a Dry Dock location and works, that meet the requirements of NLB. A brief outline is below: NLV Pharos 20 year special survey drydock - Tank/Hull inspection/survey - Ship side valves overhaul/survey - All safety equipment/systems major overhaul/survey Class society: Lloyds Register Full Hull painting Thruster overhauls (completed by OEM) Electrical Healthcare Miscellaneous works including: - ER supply fan overhaul - Helideck equipment maintenance - Mooring equipment maintenance Ship Details IMO Number - 9338606 Length Overall - 84.25metres Breadth Moulded - 16.49 metres Gross Tonnage – 3672T Dry dock blocks - Minimum of 1.5m blocks for ease of access under the vessel. Estimated Tender timeline Tender documents published- 10th August 2026 Tender submission deadline - 8th September 2026 Tender Award - Estimated 22nd September 2026 A reminder that these dates are indicative at this stage and may be subject to change. For more information about this opportunity, please visit the eSourcing portal at: https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Marine-construction-works./M83XK7BG44 To respond to this opportunity, please click here: https://nlb.delta-esourcing.com/respond/M83XK7BG44
Published contracts in the last 12 months
83
total contracts
£75.0m
total value
£1,441,447
average contract size
Typical categories