Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | NORTHERN GAS NETWORKS LIMITED |
| Main Category: | Services |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Open |
| Estimated Value (ex. VAT): | Not specified |
| Estimated Value (inc. VAT): | £12,000,000 |
| Release Date: | 16 July 2026 |
| Application Deadline: | — |
| Contract Start Date: | 1 March 2027 (Estimated) |
| Contract End Date: | 28 February 2031 (Estimated) |
| Contract Duration: | 4.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-06ccb1 |
| Notice Reference: | 067166-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | With mini-competition (call-off via competition) |
Northern Gas Networks (NGN) is seeking to establish a multi-supplier Framework Agreement for the provision of labour resource services to support the delivery of operational activities and works across its gas distribution network. The Framework Agreement will provide NGN with access to pre-qualified suppliers capable of supplying labour resources and associated services to support a broad range of planned, reactive and emergency works across multiple operational locations within the NGN network area. Call-off contracts will be awarded in accordance with the terms of the Framework Agreement. NGN's estimated annual expenditure under the Framework Agreement is approximately £1.5 million. This value is provided for indicative planning purposes only and does not constitute any guarantee, commitment or representation regarding the volume, nature, frequency or value of work that may be awarded during the term of the Framework Agreement. Subject to the outcome of the procurement process, NGN intends to appoint up to three (3) suppliers per Lot, within each geographic area, to the Framework Agreement. Suppliers are strongly advised to review all procurement documentation associated with this event and ensure they fully understand the requirements, evaluation methodology, scope of services, and instructions contained within the tender documents. It is the responsibility of each supplier to consider all information provided as part of this procurement when preparing and submitting their response. Failure to take account of the information contained within the procurement documents, including any supporting guidance and information published through Market Dojo, may adversely affect a supplier's submission.
Provision of joinery services including: - Forced entry and property securing works - Repair and reinstatement of domestic and non-domestic property - Alterations to enable access to gas infrastructure - Repair/replacement of fixtures including doors, glazing, and flooring
Contract period: 1 March 2027 → 28 February 2031
Inspection, repair and reinstatement of damaged drainage systems and ducts Typically delivered during daytime hours, including weekends and bank holidays
Contract period: 1 March 2027 → 28 February 2031
Provision of qualified electrical operatives Earth bonding and associated works Repair or reinstatement of internal and external electrical supplies affected by gas works
Contract period: 1 March 2027 → 28 February 2031
Tree removal, pruning and hedge cutting Vegetation clearance to enable safe access to sites Site clearance and disposal of organic waste Removal, treatment and safe disposal of bird droppings (guano) and other biological hazards where present.
Contract period: 1 March 2027 → 28 February 2031
Design, erection, inspection and dismantling of scaffolding Support for both planned and emergency works across domestic and commercial settings
Contract period: 1 March 2027 → 28 February 2031
Reinstatement of disturbed flooring Carpet cleaning and repair Occasional full installation works
Contract period: 1 March 2027 → 28 February 2031
Comprehensive reinstatement services including: - Site assessment, design and preparation - Groundworks and sub-base installation - Drainage and SuDS compliance - Installation of various surface types (block paving, asphalt, resin, concrete, gravel) - Ancillary works (kerbs, edging, access features) - Quality assurance, handover and documentation Works must comply with NRSWA, SROH, and all relevant standards.
Contract period: 1 March 2027 → 28 February 2031
Minor building and repair works including plastering, rendering, tiling, and general fabric repairs Capability to undertake larger scoped works requiring quotation following site survey
Contract period: 1 March 2027 → 28 February 2031
Document pack· 3 files
Published contracts in the last 12 months
63
total contracts
£106.3m
total value
£8,861,833
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →