| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | National Highways Limited |
| Main Category: | Services |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
25 June 2026
Closed
Estimated Value
£340,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £340,000 |
| Release Date: | 7 July 2026 |
| Application Deadline: | 25 June 2026 |
| Contract Start Date: | 6 July 2026 |
| Contract End Date: | 31 March 2028 |
| Contract Duration: | 1.8 years |
| Procurement ID (OCID): | ocds-b5fd17-08dee023-e566-49e2-b4c6-b04bb5d8219f |
| Notice Reference: | 653506d0-db01-4fcd-a08a-6eff461fef2d-905077 |
Awarded to
| Award value: | £339,914.45 |
| Award decision date: | 6 July 2026 |
| Award status: | Active |
This project (Phase 2 of a two-phase programme) specifically aims to investigate and validate the expanded use of lower-carbon binary and ternary blended cements by increasing the proportion of PC replacement with supplementary cementitious materials (SCMs) such as calcined clays, limestone, and other viable alternatives, through a staged laboratory experimental research and testing programme. The research will explore blend combinations and replacement levels that exceed those currently allowed under UK standards, including BS 8500:2023, the Manual of Contract Documents for Highway Works (MCHW), and the Design Manual for Roads and Bridges (DMRB). By reducing reliance on traditional SCMs such as Ground Granulated Blast Furnace Slag (GGBS) and Fly Ash (FA), which both are subject to supply limitations, this project aims to support the wider adoption of more sustainable and readily available alternatives, including calcined clays and limestone. The project will also provide the technical evidence required to inform future updates to UK concrete standards, supported by the results of an experimental research programme. This work will build on the literature review, feasibility study, and detailed testing specification developed as part of the deliverables from the successfully completed Phase 1 of the project. This will enable the deployment of lower-carbon cement blends at scale while ensuring the durability, performance, and long-term resilience of the UK's concrete infrastructure is maintained.
Published contracts in the last 12 months
824
total contracts
£12631.7m
total value
£21,741,261
average contract size
Typical categories
Traffic Speed Condition Survey 2027 - 2032 (TRACS6) - UK1 Pipeline Notice
National Highways Limited · WAC-640702
Strategic Charging Infrastructure Scheme
National Highways Limited · WAC-637840
Provision of leading indicators for health protection reporting
National Highways Limited · WAC-635810