Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Natural Resources Wales |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | £2,000,000 |
| Estimated Value (inc. VAT): | £2,400,000 |
| Release Date: | 23 June 2026 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-06ba93 |
| Notice Reference: | 058736-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots. Lot 1 – Mountain Bike Trail Maintenance Works Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to: • Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor. • Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk. • Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager. • Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure. • Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities. • Emergency call-out works, including outside normal working hours (09:0–17:0, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements. Lot 2 – Mountain Bike Trail Design and Construction Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include: • Detailed trail design. • Securing all necessary permissions, approvals, consents and licences required for project delivery. • Corridor clearance and construction of trails to the specification and grading requirements defined by the Client. • Testing, commissioning and certification that the completed works are fit for purpose. • Formal handover of completed trails and associated documentation to the Client.
Published contracts in the last 12 months
115
total contracts
£173.9m
total value
£5,609,742
average contract size
Typical categories
Afon Cwm Penamnen Hydro Expression of Interest
Natural Resources Wales · WAC-614874
Natural Resources Wales - Ground Preparation Services Framework Agreement
Natural Resources Wales · WAC-612569
NRW Civil Engineering & Infrastructure FWA 2026-2034
Natural Resources Wales · WAC-598097
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£2,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →