Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Ministry of Defence |
| Main Category: | Works |
| Procurement Method: | Restricted procedure (above threshold) |
| Tender Status: | Open |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
1 July 2026
12 days left
Estimated Value
£312,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £312,000 |
| Release Date: | 19 June 2026 |
| Application Deadline: | 1 July 2026 |
| Contract Start Date: | 30 September 2026 (Estimated) |
| Contract End Date: | 1 March 2027 (Estimated) |
| Contract Duration: | 5 months |
| Procurement ID (OCID): | ocds-b5fd17-38666829-71eb-4940-bdac-8dd43be6ce1b |
| Notice Reference: | 88f31b88-1316-4f9b-ac3f-da4dbf6753e0-902885 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
The work to be delivered under this contract broadly comprises 2 elements: 1. Works that NGED require their customer to complete on their behalf, which is a stipulation of their quote, dated 14 August 2025 (Appendix 03 - Quotation). 2. Upgrade work required to be undertaken on the existing site electrical distribution infrastructure. 3. A general plan of the works (NGED drg 5645691) to be undertaken by NGED is included at Appendix A. This shows the main electrical components referred to in this scope, their locations, cable routes etc. It is included here for information only. Scope of Work Description The works required to facilitate uplift of the MIC comprise the following: 1. Undertake excavation / trenching (incl back-filling), to their specification, to allow NGED to install 7 X 600mm² AL solidal (LV) cables between the site boundary and the new site intake switchroom. 2. Design and construct a new site intake switchroom to include a new LV intake switchboard and requisite earthing. 3. Design and install inter-connecting LV cables between the new site intake switchroom and the existing (former) site intake switchroom (to provide a back-feed to the camp). 4. Provide builderswork in connection comprising: a. A new base for the new LV intake switchboard. b. A new GRP substation enclosure. c. New lighting, small power and background heating for the substation. d. Excavation / trenching (incl back-filling) for the new inter-connecting LV cables. 5. New handover information and documentation. 6. Provide temporary power for the Camp during the shutdowns.
Document pack· 2 files
Published contracts in the last 12 months
1,654
total contracts
£37096.6m
total value
£42,107,432
average contract size
Typical categories
Beckingham Camp_Electrical Intake Upgrades to support DNO upgrades
Ministry of Defence · WAC-613661
Core Applications and Management Service (CAMS) - UK2
Ministry of Defence · WAC-613714
Core Applications and Management Service (CAMS) - UK2
Ministry of Defence · WAC-613830