| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | City Building (Glasgow) LLP |
| Main Category: | Works |
| Procurement Method: | Restricted procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 14 October 2024 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-02e2ac |
| Notice Reference: | 032980-2024 |
All 2 notices for this procurement, oldest first.
Construction and Trades Sub Contractor Framework
Construction and Trades Sub Contractor Framework
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
Awarded to (298 suppliers)
| Award status: | Active |
Provision of construction and trade sub-contractor works and services for a period of 24 months with options to extend up to a further 24 months at City Building (Glasgow) LLP's absolute discretion. The contract will be splitinto various lots each of which covers a particular trade or area of work. No guarantee of workload can be given.Allocation of work will be through mini-competition or by direct award when the terms of the framework permit.
Works involved within this Lot may include (but not limited to the following): Architectural Fencing and Gates. Weldmesh Fencing and Gates. Specialist Metalworks. Balustrades, handrails etc
Works involved within this Lot may include (but not limited to the following): Reinforced Structural Concrete. Formwork. Insitu Concrete. Reinforcement. Formwork
Works involved within this Lot may include (but not limited to the following): Intumescent painting. Insulating sheets/quilts/boards. Fire proofing partitions/ wall and floor penetrations Bidders must provide evidence of FIRAS Accreditation
Works specific to this Lot may include (but not limited to) the following: Bulk Earthworks General groundworks Foundations Drainage installations Tar Works Landscaping Concrete works Specialist foundation solutions Retaining Walls External Works
Works involved within this Lot may include (but not limited to the following): Sprinkler Pipework. Sprinkler Tanks. Life safety systems
Works involved within this Lot may include (but not limited to the following): Dry Risers
Works involved within this Lot may include (but not limited to the following): Plumbing Heating Ventilation Gas Installations Sanitaryware BMS Trace Heating Air Conditioning Electrical installations Power Data IT Bidders must provide evidence of NICEIC or SELECT Bidders must provide evidence of GAS SAFE
Works involved within this Lot may include (but not limited to the following): Plastering. Specialist Plastering Works. Ames Taping
Works involved within this Lot may include (but not limited to the following): General Decoration Works. Internal and External Painting. Ames taping.
Works involved within this Lot may include (but not limited to the following): Suspended ceilings. General ceiling installations Miscellaneous joinery works
Works involved within this Lot may include (but not limited to the following): Domestic Electrical Installations/Upgrades. Re-Wiring. Maintenance. Bidders must provide evidence of NICEIC or SELECT
Works involved within this Lot may include (but not limited to the following): Commercial Electrical Installations. Standard Wire Armour. Containment. Lighting and Power Systems. Bidders must provide evidence NICEIC or SELECT
Works involved within this Lot may include (but not limited to the following): Rainwater pipework/gutters. Foul drainage above ground. Pipelines & ancillaries. Boiler Installations. Sanitaryware. Water Services. Heating Services. Bidders must provide evidence of GAS SAFE
Works involved within this Lot may include (but not limited to the following): Core Cutting.
Works involved within this Lot may include (but not limited to the following): Internal sealants. External sealants.
Works involved within this Lot may include (but not limited to the following): Curtain walling. Rainscreen Cladding. Cladding Systems.
Works involved within this Lot may include (but not limited to the following): General Glazing. Manifestations to glazing.
Works involved within this Lot may include (but not limited to the following): Solar PV Works & Associated Electrical Works.
Works involved within this Lot may include (but not limited to the following): Air Source Heat Pumps & Associated Systems (i.e. Underfloor heating etc) Bidders must provide evidence of Micro generation Certification Scheme
Works involved within this Lot may include (but not limited to the following): Biomass Installations. Wind Energy Installations. Hydro Energy Installations. Air Source Heat Pumps Electric charging points Ground source heat pumps MVHR Solar Thermal Battery storage Bidders must
Works involved within this Lot may include (but not limited to the following): Stone tiling. Concrete tiling. Quarry tiling. Ceramic tiling. Terrazzo tiling/in situ terrazzo. Mosaic tiling.
Works involved within this Lot may include (but not limited to the following): Vinyl flooring. Carpet tiling. Edge fixed carpeting. Rubber/Plastics/Cork/Lino sheeting.
Works involved within this Lot may include (but not limited to the following): General Joinery works Plaster boarding Metal framed partitions & ceilings Timber partitions Internal doors External doors and windows Internal Staircases Kitchen Installations IPS toilet cubicles Ironmongery
Works involved within this Lot may include (but not limited to the following): Curtains. Blinds.
Works involved within this Lot may include (but not limited to the following): Timber board flooring/sheating/linings/casings. Timber narrow strip flooring/linings. Wood block/composition block/parquet flooring.
Works involved within this Lot may include (but not limited to the following): Ariel Installations.
Works involved within this Lot may include (but not limited to the following): Data Cabling. IT hub Installations. Secondary Electrical Containment Bidders must provide evidence of NICEIC or SELECT
Works involved within this Lot may include (but not limited to the following): Roller Shutters. Electrical Controls.
Works involved within this Lot may include (but not limited to the following): Asbestos Removal. Asbestos Encapsulation. Bidders must provide evidence of Licence with Asbestos Licensing Unit (ALU)
Works involved within this Lot may include (but not limited to the following): Artificial sportsground surfaces.
Works involved within this Lot may include (but not limited to the following): Air Conditioning Systems. Bidders must provide evidence of NICEIC or SELECT
Works involved within this Lot may include (but not limited to the following): Bathroom Adaptions. Access Adaptions. Kitchen Adaptions. Bidders must provide evidence of NICEIC or SELECT
Works involved within this Lot may include (but not limited to the following): Concrete Repair Works.
Works involved within this Lot may include (but not limited to the following): Lead Works.
Works involved within this Lot may include (but not limited to the following): Dry Screeding. Wet Screeding.
Works involved within this Lot may include (but not limited to the following): Specialist Joinery Works. Bespoke Joinery Works.
Works involved within this Lot may include (but not limited to the following): General air ductlines & ancillaries. Bidders must provide evidence of Gas Safe
Works involved within this Lot may include (but not limited to the following): Heating Installations. Ventilation Installations. Bidders must provide evidence of NICEIC or SELECT Bidders must provide evidence of Gas Safe
Works involved within this Lot may include (but not limited to the following): Underfloor Heating Installations.
Works involved within this Lot may include (but not limited to the following): Adjustable Steel Frame Installation. Decorative Removable Panel Installation. Sanitaryware Installation.
Plumbing & Heating Commissioning works Bidders must provide evidence of Gas Safe
Works involved within this Lot may include (but not limited to the following): Internal Cleaning. Façade Cleaning.
Works involved within this Lot may include (but not limited to the following): Demolition Works. Bidders must provide evidence of National Federation of Demolition Contractors or Equivalent
Works involved within this Lot may include (but not limited to the following): Fire Alarms. Intruder Alarms. Disabled Refuge Alarms. Disabled Toilet Alarms. Door Entry Systems. CCTV Systems. Bidders must provide evidence of BAFE SP203-1 – Fire Alarm Design NSI Gold – For Fire Systems NSI Nacoss Gold – For Security Systems
Works involved within this Lot may include (but not limited to the following): Joinery Works. Mechanical Works. Electrical Works. Builder Works. Bidders must provide evidence of Gas Safe Bidders must provide evidence of NICEIC or SELECT
Works involved within this Lot may include (but not limited to the following): Full Installation of Controlled Entry Systems including Pac token systems, Key systems & wireless systems Installation, where required, of door sets to reflect client’s demands Repair & maintenance of existing Systems including, door panels, control panels, handsets and wiring. Bidders must provide evidence NICEIC or SELECT
Works involved within this Lot may include (but not limited to the following): Plastered coatings. Rendered coatings. Roughcast coatings. Resin bound mineral coatings. Specialist waterproof rendering. Insulation with rendered finish. Sprayed mineral fibre coatings. Metal mesh lathing/Anchored reinforcement for plastered coating.
Works involved within this Lot may include (but not limited to the following): Gas Fire Servicing. Boiler Servicing. Bidders must provide evidence of Gas Safe
Works involved within this Lot may include (but not limited to the following): Domestic Gas Pipework Installations. Commercial Gas Pipework Installations. Gas Boiler Installations Central Heating Installations Bidders must provide evidence of Gas Safe
Works involved within this Lot may include (but not limited to the following): Installation of Electrical vehicle charging points and associated works Maintenance of Electrical Vehicle charging points and associated works. Bidders must be approved NICEIC or SELECT
Works involved within this Lot may include (but not limited to the following): Minor drainage repairs including civil works. Drain cleaning. Chute cleaning to multi-storey properties
Works involved within this Lot may include (but not limited to the following): Internal insulation systems (Walls/ Floors/ Roofs etc) Passivhaus Informed Technologies including, but not limited to: Specialist Timber Construction Cross Laminated Timber Construction Triple Glazing Air Tightness methodologies
Works involved within this Lot may include (but not limited to the following): Ventilation Assessments Purge ventilation Background ventilation Intermittent Extract Ventilation systems/ Extractor Fans Associated works (ie. door undercutting etc) Retrofit Designing Retrofit Assessments Retrofit Coordination
Works involved within this Lot may include (but not limited to the following): Insulating solid external walls Insulating cavity external walls Render/ Cladding/ Tiled/ Brick Slip finishes All associated finishings, membranes, sealants Design of new systems (and associated statutory consents/funding applications)
Works involved within this Lot may include (but not limited to the following): Insulating existing walls Insulating existing floors/ ceilings Erection of new partitions All associated works (removing all internal/ external fittings)
Works involved within this Lot may include (but not limited to the following): Solar Battery Storage Systems Battery Energy Storage Systems (BESS) – Solar/ Wind etc Compressed Air Energy Storage Mechanical Gravity Energy Storage Flow Batteries
Works involved within this Lot may include (but not limited to the following): Patent glazing. Plastics profiled sheet cladding. Structural glass assemblies. Rigid sheet cladding. Timber weatherboarding. Metal profiled sheet cladding. Natural stone cladding.
Works involved within this Lot may include (but not limited to the following): Carpentry/Timber framing. First Fixing. Prefabricated timber unit decking. Timber Kit Erection Timber infill panels Roof trusses Floor Joists
Works involved within this Lot may include (but not limited to the following): Timber fencing. Timber gates. Timber hoarding. Soft Landscaping etc Hard Landscaping etc
Works involved within this Lot may include (but not limited to the following): Brick/Block walling. Glass block walling. Masonry Work. Lintels. General builders work Slappings etc
Works involved within this Lot may include (but not limited to the following): Clay/concrete roof tiling. Fibre cement slating. Natural slating.
Works involved within this Lot may include (but not limited to the following): Felt roof coverings. Single layer plastic roof coverings. Proprietary roof coverings. Metal Roofing
Works involved within this Lot may include (but not limited to the following): Scaffolding Installations. Tube & Fitting Scaffolding Single/ Double Scaffolding Cantilever/ Suspended Scaffolding Scaffolding Design Services All of the above can be within fast reactive Repairs and Maintenance, within External Refurbs and within Construction Works
Works involved within this Lot may include (but not limited to the following): Plumbing Heating Ventilation Gas Installations Sanitaryware BMS Trace Heating Air Conditioning Bidders must provide evidence of NICEIC or SELECT
Published contracts in the last 12 months
7
total contracts
£38.4m
total value
£12,800,000
average contract size
Typical categories
CBG271 - Supply and Delivery of Lift Packages
City Building (Glasgow) LLP · WAC-604433
Hire of Plant Equipment, Refuse Slips & Support Services (with on-site managed service)
City Building (Glasgow) LLP · WAC-547319
CBG269 - RSBi Specialist Ironmongery
City Building (Glasgow) LLP · WAC-492976
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →