Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Nottingham City Council |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 26 May 2026 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-06a3ab |
| Notice Reference: | 048800-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Nottingham City Council is seeking to appoint a suitably qualified and experienced contractor for a scheme covering the following elements: • RIBA Stage 4 design of a new rail gantry and associated pipework. • Construction of a new rail gantry and associated pipework. • Commissioning of new pipework and associated electrical connections. • Demolition and removal of the existing rail gantry. Nottingham City Council operates a district heating system from its London Road Heat Station. The system serves c5,000 households and commercial customers with heat and hot water, alongside a private wire with c200 domestic and business users. The main energy supply to the heat station is from a high-pressure steam feed from the nearby Eastcroft Incinerator. The steam is fed through a pipe which crosses the railway by a gantry to the east of Nottingham Station and west of London Road. The Authority has been asked to move the existing gantry to align closer to London Road to allow a proposed development to take place on the site to the north of the railway. A RIBA Stage 3 design has been undertaken and planning permission for the scheme is being sought. The contractor, or a member of their consortium for group bids, will need to be a Network Rail approved contractor and have experience in the construction and commissioning of high-pressure steam and other ancillary pipes and electrical connections. The commissioning of the new pipes is targeted to take place during the summer shutdown in July 2027.
Published contracts in the last 12 months
591
total contracts
£1061.6m
total value
£2,570,430
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →