Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Balfour Beatty VINCI JV HS2 |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: | Open |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
20 May 2026
Closed
Estimated Value
£1,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £1,000,000 |
| Release Date: | 13 May 2026 |
| Application Deadline: | 20 May 2026 |
| Procurement ID (OCID): | ocds-b5fd17-59d0b0c3-4ffe-4ba9-a9ad-b3c792c54f08 |
| Notice Reference: | dd4927e0-8991-4aa8-9ea6-ecb6676e7d86-896927 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
This scope is for the provision of cut and bent steel reinforcement for Curzon Approach Viaducts. The supplier should review the steel reinforcement drawings and cut and bent steel in accordance with the drawings and bar bending schedules provided by the Contractor. The bars should be cut and bent at the supplier's premises and comply with the relevant BBV/HS2 specification and relevant British Standards: • All hot rolled and cold worked steel bars shall conform to BS EN 10080 and BS 4449 Grades B500B or B500C • BS 8666 from 2005 and eventually 2020 Scheduling, dimensioning, bending and cutting of Steel Reinforcement for Concrete • The mandrel diameter for bending bars shall comply with Clause 8.3 of BS EN 1992-1-1. • CARES product acceptance scheme for steel reinforcement • Couplers shall be TA1A CARES certified The supplier should also provide any couplers including threading and any relating protection of the re-bars. Bars should be delivered to site labelled with the references of the bar bending schedule and pre-slung to facilitate safe unloading. Supplier should also provide any method statements and their related risk assessment as well as all relevant quality documentation such as quality management plan, grade mill certificates for the supplied re-bar, CARES certificates, CARS certificates and technical data sheets for the couplers, samples for testing (if required) and any other required to demonstrate compliance with the specification and industry standards. The package covers three key activities spanning over the next 2 and half years. These are the construction of the complex Curzon no. 3 post tensioned reinforced concrete deck and its finishes with 6220m3 of concrete and 2384tonnes of reinforcement remaining, the construction of the deck finishing works across the remaining assets of Curzon Approach (Curzon no. 2, Curzon no. 1 and Duddeston Viaduct) with ....tonnes remaining and the fabrication of the precast concrete slabs for Curzon Approach at BBV Kingsbury Yard with ....tonnes remaining. Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
Document pack· 1 file
Published contracts in the last 12 months
15
total contracts
£20.6m
total value
£1,370,000
average contract size
Typical categories