Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: |
| LHC Procurement Group |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Open |
| Estimated Value (ex. VAT): | £1,000,000,000 |
| Estimated Value (inc. VAT): | £1,200,000,000 |
| Release Date: | 29 April 2026 |
| Application Deadline: | 17 June 2026 |
| Enquiry Deadline: | 3 June 2026 |
| Procurement ID (OCID): | ocds-h6vhtk-06093d |
| Notice Reference: | 039441-2026 |
All 2 notices for this procurement, oldest first.
Housing Construction, Demolition, and Remediation
Housing, Regeneration and Demolition (H3) Framework
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | Both: direct call-off and mini-competition |
LHCPG is seeking to establish a multi-supplier Framework Agreement for the provision of housing, regeneration, demolition, remediation and enabling works across the United Kingdom. The Framework will support the delivery of: New build residential developments Retrofit and estate regeneration Demolition services Remediation and enabling works Defence housing and secure environment works Appointed suppliers will deliver works as Principal Contractor, including associated design responsibilities, in compliance with relevant statutory, regulatory and funding requirements. In order to encourage SME Bidders LHCPG are reserving up to 3 (three) places within Lots 1, 6, 8, 10 and 11 for Micro or Small Enterprises.
This workstream covers the delivery of new build residential (1 - 10 Units) developments across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives. Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements.
This workstream covers the delivery of new build residential developments (11 to 25 units) across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives. Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements.
This workstream covers the delivery of new build residential developments (26 to 50 Units) across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives. Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements.
This workstream covers the delivery of new build residential developments (Over 50 Units) across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives. Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements.
This workstream covers the delivery of new build residential developments (Housing above 18m in height) across the UK, including houses, apartments, and mixed-use schemes, as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. Appointed companies will be required to act as Principal Contractor and undertake associated design responsibilities, delivering projects in compliance with all relevant regional regulations, funding requirements and standards, including those relating to building safety, energy performance, and net zero carbon objectives. Solutions may incorporate both traditional construction and Modern Methods of Construction (MMC), where appropriate to project requirements.
This workstream covers the delivery of retrofit, refurbishment and estate regeneration (0 to 2m value band) to existing housing across the UK including houses, apartments as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. The Retrofit works may include but are not limited to (i) Internal modernisation, extensive redecoration, (ii) Re-wiring, (iii) Replacing space heating systems, (iv) Replacing doors and windows, (v) Relacing Kitchens and Bathrooms (vi) Essential repairs to the building fabric (vii) Improvements to the energy efficiency of the building (viii) The extension or conversion of an existing building. The estate Regeneration works primarily target the broader physical environment and may include but not limited to (i) Introduction of Landscaping (ii) Repairs to infrastructure (iii) Play areas and equipment.
This workstream covers the delivery of retrofit, refurbishment and estate regeneration (Over 2m value band) to existing housing across the UK including houses, apartments as well as specialist accommodation such as supported living, care facilities, student housing and key worker accommodation. The Retrofit works may include but are not limited to (i) Internal modernisation, extensive redecoration, (ii) Re-wiring, (iii) Replacing space heating systems, (iv) Replacing doors and windows, (v) Relacing Kitchens and Bathrooms (vi) Essential repairs to the building fabric (vii) Improvements to the energy efficiency of the building (viii) The extension or conversion of an existing building. The estate Regeneration works primarily target the broader physical environment and may include but not limited to (i) Introduction of Landscaping (ii) Repairs to infrastructure (iii) Play areas and equipment.
This workstream covers the delivery of full and partial demolition (0 to 1m value band) works across a range of residential and associated non-residential assets, including site clearance and preparation for redevelopment. Works may include soft strip, structural demolition, removal of below-ground obstructions, hazardous material remediation, service disconnections and diversions, and associated enabling works. Appointed companies will be required to deliver a complete end-to-end service, including demolition planning, temporary works, environmental management and site handover, ensuring all activities are carried out in compliance with relevant legislation, health and safety requirements and recognised industry standards.
This workstream covers the delivery of full and partial demolition works (Over 1m value band) across a range of residential and associated non-residential assets, including site clearance and preparation for redevelopment. Works may include soft strip, structural demolition, removal of below-ground obstructions, hazardous material remediation, service disconnections and diversions, and associated enabling works. Appointed companies will be required to deliver a complete end-to-end service, including demolition planning, temporary works, environmental management and site handover, ensuring all activities are carried out in compliance with relevant legislation, health and safety requirements and recognised industry standards.
This workstream covers the delivery of site remediation works required to prepare land for development, including the treatment and management of contaminated land, ground improvement, and associated site preparation activities. Works may include the development and implementation of remediation strategies, removal or containment of contaminants, gas protection measures, verification and validation reporting, and the safe management of materials. Enabling works may include site clearance, earthworks, utility disconnections, ecological and arboricultural protection measures, and the establishment of site access and security. Appointed companies will be responsible for delivering a fully managed service, including the preparation of remediation method statements, compliance with statutory and environmental requirements, and provision of verification documentation to support regulatory approval and site handover.
This workstream covers the delivery of enabling works required to prepare land for development, including the treatment and management of contaminated land, ground improvement, and associated site preparation activities. Works may include the development and implementation of remediation strategies, removal or containment of contaminants, gas protection measures, verification and validation reporting, and the safe management of materials. Enabling works may include site clearance, earthworks, utility disconnections, ecological and arboricultural protection measures, and the establishment of site access and security. Appointed companies will be responsible for delivering a fully managed service, including the preparation of remediation method statements, compliance with statutory and environmental requirements, and provision of verification documentation to support regulatory approval and site handover.
This workstream covers the delivery of new build housing, refurbishment, and associated enabling works within defence and secure environments across the UK, including Ministry of Defence (MoD) accommodation and related infrastructure. Works may include residential development, site preparation, infrastructure and estate regeneration activities, delivered in accordance with project-specific requirements and operational constraints. Appointed companies will be required to deliver a fully managed service, including compliance with enhanced security, information management and personnel vetting requirements, alongside all relevant statutory, technical and government standards. Suppliers must demonstrate the capability to operate within secure environments, including maintaining appropriate certifications (such as cyber security and information management standards), and ensuring continuity of suitably cleared personnel throughout the lifecycle of each project.
Document pack· 1 file
Published contracts in the last 12 months
10
total contracts
£2040.0m
total value
£340,000,000
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
17 June 2026
13 days left
Estimated Value
£1,000,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →