Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Sizewell C Limited |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Open |
| Estimated Value (ex. VAT): |
| £30,000,000 |
| Release Date: | 29 April 2026 |
| Application Deadline: | 8 May 2026 |
| Procurement ID (OCID): | ocds-b5fd17-c1f0f7c9-3cd4-4454-be08-20030aa4fa1b |
| Notice Reference: | 17bb5818-d6ec-4a70-96f9-1dab83a6538d-895336 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
The scope of works for this package includes: • Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems • Data acquisition and telemetry for transmission to a Client owned database and visualisation platform (This package of work does not include provision of the database) • All instrumentation is expected to be battery or solar powered • Compliance with relevant industry standards and regulatory requirements • Joint Ventures/Alliances will be considered Packages of work area as follows: InSAR Satellite • Provision of historical data to cover the area of Sizewell B and Sizewell C. • Provision of multi-directional coverage and analysis of the Sizewell B and Sizewell C area until 2036 (period maybe extended). Unit 1 and 2 Plastic Wall Monitoring • Commence September 2026, end June 2027 • Drilling of approx. 200nr installation boreholes to a depth of 55m below ground level • Installation of IPI, IPIX, VWP and GNSS positional location monitoring Unit 1 and 2 Retaining Walls • Commence September 2026, end January 2028. • Installation in void formers at 200nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Shafts and Tunnels • Commence May 2027, end December 2027. • Installation in void formers at 50nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Backfill Specification • Commence September 2027, end January 2029. • Installation under main nuclear islands • Installation of horizontal Inclinometers/SAA, hydraulic settlement cells and extensometers Provision of Maintenance Team • Commence September 2026, end December 2036 (maybe extended. • Provision of maintenance services to ensure operation of installed instrumentation, maintaining solar and battery powered equipment. • Undertaking manual monitoring where necessary Additional information: It will be beneficial for you to describe your business as mush as possible and highlight where you can help us to achieve our values described above
Document pack· 1 file
Published contracts in the last 12 months
16
total contracts
£521.8m
total value
£32,609,375
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
8 May 2026
Closed
Estimated Value
£30,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →