Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | Department for Transport |
| Main Category: | Services |
| Procurement Method: | Direct award |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 7 April 2026 |
| Application Deadline: | — |
| Contract Start Date: | — |
| Contract End Date: |
All 4 notices for this procurement, oldest first.
TROO0487 IEP Escrow Verification Services
TROO0487 IEP Escrow Verification Services
TROO0487 IEP Escrow Verification Services
TROO0487 IEP Escrow Verification Services
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award value: | £398,729 |
| Award decision date: | — |
| Award status: | Pending |
Under the IEP ECML contract, the Department, along with Agility Trains East (ATE) and Hitachi Rail Limited (HRL), were obliged to enter into an IP Escrow Agreement with NCC Group (NCC). As part of this Agreement, the cost of any verification works by NCC shall be borne by the Department. NCC are now commencing the works to verify the material deposited in escrow which can be rebuilt completely independently of HRL by the NCC technical team. Hence a Direct Award with NCC in order to provide payment and fulfil our obligations. The primary focus of the engagement with NCC is to validate that the source code, assets, and components deposited in escrow can be rebuilt independently simulating the steps that would need to be replicated in the event of supplier failure. By conducting this level of verification, the Department are ensuring that the escrow protection in place can be utilised for Business Continuity purposes. IEP (InterCity Express Programme) require the provision of services with NCC to validate that the source code, assets, and components deposited in escrow can be rebuilt independently simulating the steps that would need to be replicated in the event of supplier failure. By conducting this level of verification, the Department are ensuring that the escrow protection in place can be utilised for Business Continuity purposes. IEP understand that this service will be ongoing through-out the duration of the Master Availability and Reliability Agreement (MARA ) and Train Availability and Reliability Agreement (TARA) contracts and the life span of the current trains. IEP would like to consider the use of a different way to procure these services which last longer than a single year at a time after.
Published contracts in the last 12 months
289
total contracts
£4025.2m
total value
£52,274,818
average contract size
Typical categories
Department for Transport Shared Research, Evaluation and Analysis
Department for Transport · WAC-637163
Department for Transport Shared Research, Evaluation and Analysis
Department for Transport · WAC-636505
Trace, Evaluate and Reinforce (TracER)
Department for Transport · WAC-635872
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| — |
| Contract Duration: | NaN years |
| Procurement ID (OCID): | ocds-h6vhtk-06698a |
| Notice Reference: | 031595-2026 |