CUE & Butterfly House Decarbonisation
| Source: | Find a Tender Service (FTS) |
| Buyer: | THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST |
| Main Category: | Works |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Active |
| Estimated Value (ex. VAT): | £900,000 |
| Estimated Value (inc. VAT): | £1,080,000 |
| Release Date: | 18 March 2026 |
| Application Deadline: | 10 April 2026 |
| Enquiry Deadline: | 5 April 2026 |
| Contract Start Date: | 3 September 2026 (Estimated) |
| Contract End Date: | 31 March 2028 (Estimated) |
| Contract Duration: | 1.6 years |
| Procurement ID (OCID): | ocds-h6vhtk-066112🔒 BidWriter |
| Notice Reference: | 024609-2026🔒 BidWriter |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Description
The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016 as glasshouse for tropical plants and butterflies. The Horniman wish to engage a Main Contractor who will manage and deliver the implementation of the decarbonisation of the above buildings in the listed setting. The works will be let on the basis of traditional JCT contract intermediate form without quantities, but with some contractor design elements. As part of the Horniman's Climate and Ecology Manifesto we have made a commitment to become Greenhouse Gas Neutral by 2040. The key objective of this project is to move us towards this goal by doing the following: • Butterfly House: Replacing the gas cabinet air heater with air-to-air Air Source Heat Pumps (ASHPs). • Butterfly House: Thermal performance and air tightness improvement by replacing existing glass and acrylic with triple layer polycarbonate cladding to existing steel structure with new aluminum glazing bars, window and vents. • Butterfly House: Thermal performance and carbon reduction by installation of new trench heating with new Air Handling Unit and visitor path surface or as an alternative an fan-coil system • CUE: Replacing the gas boiler in the Centre for Understanding the Environment (CUE) building with air-to-water Air Source Heat Pumps. • CUE: Improve the thermal performance and air tightness improvement by draught proofing and thermal bridge mitigation including floor, wall and roof new thermal insulation. • CUE: Install Mechanical Ventilation Heat Recovery (MVHR) • Upgrading the electrical cables inside both the Butterfly House and CUE building.
Links & Documents
Apply Online
Proceed to the official portal to submit your bid.
Similar contracts
CUE & Butterfly House Decarbonisation
THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST · WAC-577091
CUE & Butterfly House Decarbonisation
THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST · WAC-570963
CUE & Butterfly House Decarbonisation
THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST · WAC-570199
Pipeline status
Not addedContract imported automatically · AI writes the response
Assign to team member
Delegate this bid in BidWriter
Run Bid / No Bid analysis
Score this opportunity in BidWriter
Sign in to BidWriter to sync favourites across devices
Application Deadline
10 April 2026
1 day left
Estimated Value
£900,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →