| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Arc Property Services Partnership Limited |
| Main Category: | Goods |
| Procurement Method: | Not specified |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £5,206,983.88 |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
8 January 2026
Closed
Estimated Value
£5,206,983.88
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Release Date: |
| 17 March 2026 |
| Application Deadline: | 8 January 2026 |
| Contract Start Date: | 13 January 2026 (Estimated) |
| Contract End Date: | 12 July 2028 (Estimated) |
| Contract Duration: | 2.5 years |
| Procurement ID (OCID): | ocds-b5fd17-e7ab403c-03b2-43c9-943c-9cff6f301eb3 |
| Notice Reference: | 7506552b-754c-4208-9408-13a23234e86f-888884 |
View Original Notice
Access the full notice on the official portal
Direct award under the NHS Commercial Solutions Framework for Modular & Pre‐Fabricated Building Solutions and Associated Services (Agreement Reference: 5514‐5512). The requirement covers the design, manufacture, supply, delivery, installation, commissioning and handover of several temporary modular school buildings ("modular learning village"), together with all associated works necessary to provide fully operational teaching accommodation at St Peter's Church of England Junior School, Ruddington, Nottinghamshire. The temporary accommodation is required following the emergency closure of the existing school buildings due to unforeseen structural issues. The modular buildings are to be suitable for occupation as an educational facility and must comply with all relevant statutory requirements, regulations, guidance and standards applicable at the time of design and installation. Scope of Services The Supplier is to provide a full turnkey solution, including but not limited to: - Full design development and coordination - Manufacture of modular units - Transportation and delivery to site - Installation, erection and assembly on site - All associated groundworks, foundations and substructures - Connection to all incoming and outgoing services - Internal fit‐out and finishes (excluding Fixtures, Furniture & Equipment, which will be provided by others) - Provision of the modular units on a hire‐only basis, including delivery and removal at the end of the service period - External works necessary for access, egress and statutory compliance - Testing, commissioning and certification - Handover documentation and post‐completion support The contract will be in place for a period of 2 years, with the option to extend for a further 6 months, dependant on the new school construction. Justification for Direct Award: St Peter's School was closed at short notice following the discovery of significant structural concerns within the existing buildings. Pupils were temporarily relocated to other schools, placing additional pressure on local education provision. A rapid solution was therefore required to enable pupils to return to their own school site as soon as possible. Due to the urgen nature of the requirement, Premier Modular and two other suppliers were contacted regarding availability and indicative costs. Premier Modular confirmed that suitable modular units were available (subject to refurbishment and final design) and that installation could be achieved within the required programme. Their costs were competitive (subject to detailed design review and site surveys). Given the urgent nature of the requirement and the need to restore on‐site education provision without delay, a direct award was made. Additional information: This is a contract award notice required under the Public Contract Regulations 2015 for the emergency requirement.