Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Transport for London |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
7 April 2026
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 17 March 2026 |
| Application Deadline: | 7 April 2026 |
| Contract Start Date: | 31 July 2026 (Estimated) |
| Contract End Date: | 1 March 2027 (Estimated) |
| Contract Duration: | 7 months |
| Procurement ID (OCID): | ocds-h6vhtk-066c58 |
| Notice Reference: | 024105-2026 |
All 2 notices for this procurement, oldest first.
Engineering Vehicles (EV) - Heavy Overhaul of London Underground Switch Tilter (LUST) Wagons
Engineering Vehicles (EV) - Heavy Overhaul of London Underground Switch Tilter (LUST) Wagons
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Transport for London (TfL), on behalf of its subsidiary London Underground Limited (LUL), is undertaking early market engagement for the heavy overhaul of the London Underground Switch Tilter (LUST) wagons and associated lifting accessories. The LUST fleet forms part of the Modular Points and Crossings (MPaC) system and consists of 8 LUST wagons, 6 lifting beams, and 64 pairs of cross & connecting beams. These assets support the transportation and installation of pre‑fabricated Points & Crossings panels across London Underground and Network Rail infrastructure. TfL seeks to engage with the supply market to understand capability, capacity, and viable delivery approaches for a comprehensive heavy overhaul programme, including (but not limited to): • Full overhaul of all mechanical, structural, hydraulic, pneumatic, electrical, and safety‑critical systems. • Overhaul of all associated lifting beams, panel grabs, tandem lift beams and cross/connecting beams. • Completion of functional, static and annual maintenance tests as defined within the LUST Maintenance Manual. • LOLER inspection, NDT, structural repairs, repainting, and component replacement as required. • Production of full overhaul records, assurance certificates, and traceability documentation. This engagement aims to gather supplier feedback on methods, timescales, delivery sequencing, challenges, and risks, to shape the forthcoming procurement strategy.
Published contracts in the last 12 months
608
total contracts
£8293.3m
total value
£63,307,638
average contract size
Typical categories
Original Equipment Manufacturer (OEM) to Alternative Equipment Manufacturer (AEM) Engineering Services Framework
Transport for London · WAC-612403
Engineering Vehicles (EV) - Heavy Overhaul of London Underground Switch Tilter (LUST) Wagons
Transport for London · WAC-612632
Elizabeth Line Rostering
Transport for London · WAC-612711