Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | Department for Energy Security & Net Zero |
| Main Category: | Services |
| Procurement Method: | Below threshold - without competition |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 9 March 2026 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-0665a5 |
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award status: | Active |
The Department for Energy Security and Net Zero has awarded a contract for the provision of a qualitative assessment of the proliferation resistance and physical protection (PRPP) characteristics of advanced reactor systems adapted for potential marine propulsion applications (hereafter “the Study”). This assessment builds on previous PRPP evaluations commissioned by the Client for land‑based Generation IV reactor systems; specifically, PWR, HTGR, LFR, SFR and MSR designs and will consider how PRPP outcomes may differ when such reactor types are adapted for deployment onboard maritime vessels. The Study will include the following: 1. Technology and Design Review • Review of the global marine reactor development landscape to identify which previously assessed land‑based reactor types have credible or emerging marine‑based variants. • Identification and description of design changes associated with marine deployment, including but not limited to: Core size and configuration Core materials Fuel enrichment levels Fuel form Spent fuel volumes and properties Refuelling approach and operational cycles 2. PRPP Scenario Review • Re‑examination of the three threat scenarios used in the previous PRPP assessments (one proliferation scenario and two physical protection scenarios). • Qualitative commentary on how scenario assessments and scoring ‘would change’ because of: Siting reactors onboard maritime vessels Design modifications identified in the technology and design review 3. High‑Level Assessment Output • Development of a high‑level, qualitative description of how PRPP measure scores might be adjusted should an expert workshop be reconvened. • The Study will ‘not’ re‑score the original PRPP measures in detail, as the intent is to inform future expert assessment rather than replace it.
Published contracts in the last 12 months
204
total contracts
£1017.9m
total value
£11,835,559
average contract size
Typical categories
PS26239 - RAF015/2627 - Plug-in batteries safety study
Department for Energy Security & Net Zero · WAC-642688
Biomass Research Programme
Department for Energy Security & Net Zero · WAC-641295
PS26239 - RAF015/2627 - Plug-in batteries safety study
Department for Energy Security & Net Zero · WAC-640744
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Notice Reference: |
| 021033-2026 |