| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | Gloucestershire County Council |
| Main Category: | Works |
| Procurement Method: | Below threshold - open competition |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 4 March 2026 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-05ac25 |
All 2 notices for this procurement, oldest first.
Forest Road, Lydney Geotechnical Stabilisation
Forest Road, Lydney Geotechnical Stabilisation
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award status: | Active |
The site is located on the B4234 approximately 1.8km Northwest of the town of Lydney, Gloucestershire. The B4234 carriageway is constructed on sidelong ground and runs parallel to the River Lyd. The River Lyd runs approximately 8m below the road level. The site was identified to have defects in 2023 and has been subject to regular monitoring. The defects noted consisted of carriageway cracking, subsidence, leaning trees associated with lower slope instability and blocked gullies. A landslip occurred over a 20m length of earthwork adjacent to New Road in late 2023. The carriageway is showing signs of instability with cracking evident, and a steep face is now present at the edge of the westbound running lane. The client is looking for a Principal Contractor to deliver the construction phase of this scheme. Summary of Construction Phase key deliverables are as follows: - Provision of suitable traffic management during construction works, including full road closure and signposted diversions. - Installation of sheet piled retaining wall along an extent of 43 m - 1.6 m from carriageway edge. - Pile lengths will vary with rockhead depth, typically reaching 8.0 m. Piles will be driven to the designed toe level and cut flush with adjacent ground. - Construction of new drainage system including installation of a concrete bag headwall outfall within the embankment. - Highways reconstruction including plaining and overlay. - Installation of a VRS barrier system and wooden fencing over an extent of 131 m. - Traffic signs, kerbing, and road markings. - Coordination with BT utility diversions and protection works. A summary of the outline programme is shown below: Anticipated Works Start Date: Monday 9th February 2026 Completion: Friday 7th August 2026 Overall Duration: 26 Weeks The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.
Published contracts in the last 12 months
323
total contracts
£3942.5m
total value
£18,596,932
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Notice Reference: |
| 019562-2026 |