| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | National Highways Limited |
| Main Category: | Works |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £968,000,000 |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
26 March 2025
Closed
Estimated Value
£968,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Release Date: | 3 March 2026 |
| Application Deadline: | 26 March 2025 |
| Contract Start Date: | 9 February 2026 |
| Contract End Date: | 8 February 2032 |
| Contract Duration: | 6.1 years |
| Procurement ID (OCID): | ocds-b5fd17-42ae9037-0c21-457b-8baf-f212e117f189 |
| Notice Reference: | 71daf045-4726-42a4-8fd3-0b11328a4071-886945 |
All 3 notices for this procurement, oldest first.
Legacy Concrete Roads Reconstruction Framework
Legacy Concrete Roads Reconstruction Framework - tender
Legacy Concrete Roads Reconstruction Framework
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to (3 suppliers)
| Award value: | £968,000,000 |
| Award decision date: | 9 February 2026 |
| Award status: | Active |
National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes: - design and subsequent construction services for: - demolition of existing concrete pavements, - reconstruction of pavements (including new pavement furniture and markings) - design and delivery of associated temporary traffic management solutions, - when instructed: - involvement in optioneering, - design and construction of alterations to those legacy assets which interface with the replacement pavements' designs, which may include sub-surface drainage, street furniture and its foundations and signage, - design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings), - performing principal designer and principal contractor duties as defined under the "Construction (Design and Management) Regulations 2015" ("CDM Regulations 2015"), - carbon capture recording and reporting, - recovery, recycling and reuse of arisings during the delivery of a scheme, - engagement with all identified stakeholders, and - identification, recording and realisation of programme efficiencies. The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4. This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations. From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement.
Published contracts in the last 12 months
824
total contracts
£12631.7m
total value
£21,741,261
average contract size
Typical categories
Traffic Speed Condition Survey 2027 - 2032 (TRACS6) - UK1 Pipeline Notice
National Highways Limited · WAC-640702
Strategic Charging Infrastructure Scheme
National Highways Limited · WAC-637840
Provision of leading indicators for health protection reporting
National Highways Limited · WAC-635810