Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | THAMES WATER UTILITIES LIMITED |
| Main Category: | Works |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
6 May 2025
Closed
Estimated Value
£280,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £280,000,000 |
| Estimated Value (inc. VAT): | £280,000,000 |
| Release Date: | 1 April 2025 |
| Application Deadline: | 6 May 2025 |
| Procurement ID (OCID): | ocds-h6vhtk-04faf2 |
| Notice Reference: | 012114-2025 |
All 2 notices for this procurement, oldest first.
K298 Maple Lodge STW Quality AMP 7 New Permit
K298 Maple Lodge STW Quality AMP 7 New Permit
View Original Notice
Access the full notice on the official portal
This project includes, but is not limited to the following packages of work: An additional inlet screen with civils alterations and screening handling upgrade An additional detritor and flow inlet channel, incorporating a new storm separation weir A new storm tank and river outfall, including flow transfer culvert and new storm return pumping station Upgrades to the existing six PSTs and conversion of three storm tanks into PSTs, fitted with chain and flight scraper Replacement Primary chemical dosing pumps to aid Phosphorus removal A new activated sludge plant Bank C, with new feed PS and blowers Eight new 28m diameter final settlement tanks, interconnecting pipework, distribution chambers and RAS system A new secondary chemical dosing system to aid Phosphorus removal Two new Tertiary Solids Removal treatment plants, one serving the effluent from Bank A and B, and one serving the effluent from the new Bank C An additional Drum thickener New incoming switchboard for the new DNO supply Modification and upgrade of HV/LV networks Modification and upgrade to the power management system and site-wide SCADA Modification and upgrade to the Process SCADA Additional standby powered generation Demolition and removal of redundant structures, plant and equipment N.B. Please note that this Contract Notice shows a value of £280m. The current contract value is circa £140m-£280m.
Document pack· 1 file
Published contracts in the last 12 months
60
total contracts
£14701.7m
total value
£341,898,977
average contract size
Typical categories