Loading page content…
Loading page content…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | Mining Remediation Authority |
| Main Category: | Services |
| Procurement Method: | Below threshold - open competition |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 30 January 2026 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-055080 |
| Notice Reference: | 008412-2026 |
All 5 notices for this procurement, oldest first.
View Original Notice
Access the full notice on the official portal
The Authority invites you to tender for a contract for the provision of the construction of a flow monitoring structure at the outfall of a historic culvert. This culvert drains the dressing floor of a former mine site. The purpose of the structure is to enable accurate measurement of water flows entering a recently lined stream. The construction of a flow gauging structure at Frongoch is necessary to measure the volume of water discharging from the culvert beneath the Frongoch dressing floor. This will enable accurate quantification of heavy metal loading into the Frongoch stream, and subsequently into the Nant Cell and Afon Ystwyth. Accurate flow measurement is essential for a comprehensive assessment of the need for a mine water treatment scheme, and future design. Future flow monitoring, assessment or design does not form part of this contract. The works associated with the Frongoch Culvert Flow Monitoring are inclusive of breaking into the existing below ground culvert, as shown on drawing FCFM-AEC-XX-XX-DR-C-0003, the installation of approximately 80m of pipework, a headwall with associated access steps and V-notch weir to allow for flow monitoring.
Published contracts in the last 12 months
66
total contracts
£141.7m
total value
£8,857,813
average contract size
Typical categories
(2026 Retender) West Cannock Pumping Test and Temporary Treatment
Mining Remediation Authority · WAC-570374
(2026 Retender) West Cannock Pumping Test and Temporary Treatment
Mining Remediation Authority · WAC-565971
Mine Water Monitoring Borehole
Mining Remediation Authority · WAC-562900
Pipeline status
Not addedContract imported automatically · AI writes the response
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →Culvert Flow Gauging Structure - Ceredigion