Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | National Highways Limited |
| Main Category: | Services |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £400,000 |
| Release Date: | 29 January 2026 |
| Application Deadline: | 16 January 2026 |
| Contract Start Date: | 27 January 2026 |
| Contract End Date: | 31 May 2026 |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-0e6d2ed8-2de7-4014-aed4-ab6a05b449f1 |
| Notice Reference: | 5c96782d-d26d-498a-9cd2-9db89fd633b8-881417 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £452,132.49 |
| Award decision date: | 27 January 2026 |
| Award status: | Active |
Following on from Phase 1 GAP analysis a Detailed assessment of the design maturity to verify that the 3D digital model accurately represents the intended design, highlight and Risk, or gaps to filled before tender or by the oncoming Delivery Partner. Proposed scope detail to Include: - TA Design maturity assessment (design gap analysis) - completion based on information available to date. - PDP DCO and Stage 5 design basis - define what standards etc. - PDP design composition (List down PDP design deliverables used for this assessment) - PDP gap analysis exercise: a. Stage 5 design package completion status (% age complete, what is remaining) b. Stage 5 design package approval status and if approved with comments their significance (minor / major) (i.e. AIP approved, significance of any comments) - Define and list down design changes required post PDP work (i.e. DCO Requirements work partially completed or was not considered) - Define design changes made post PDP work (i.e. Update of Arcadis work from Nov 2024 to date) - Design opportunities / VE identification - Design risks emerging from prior to current scope including risks highlighted through gap analysis exercise Schedule of regular review meeting to monitor progress between National Highways and Arcadis to ensure output is met - Final deliverable to be in a report format, which should include the following items: - Design overview background (This section to include PDP design prior to their termination of contract) - Design maturity, design completeness, design work remaining, and design status report - Update around assurance completed by Arcadis under TA role - Design opportunities / VE identification/Efficiencies - Carbon and biodiversity position - PDP DCO and Stage 5 design basis - define what standards etc - Define design changes made post PDP work (i.e. Update of Arcadis work from Nov 2024 to date) - Define and list down design changes required post PDP work (i.e. DCO Requirements work partially completed or was not considered) - Identify areas around design de-risking ahead of / during procurement for National Highways
Published contracts in the last 12 months
824
total contracts
£12631.7m
total value
£21,741,261
average contract size
Typical categories
Traffic Speed Condition Survey 2027 - 2032 (TRACS6) - UK1 Pipeline Notice
National Highways Limited · WAC-640702
Strategic Charging Infrastructure Scheme
National Highways Limited · WAC-637840
Provision of leading indicators for health protection reporting
National Highways Limited · WAC-635810
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
16 January 2026
Closed
Estimated Value
£400,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →