Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | UNITY SCHOOLS PARTNERSHIP |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | £1,500,000 |
| Estimated Value (inc. VAT): | £1,800,000 |
| Release Date: | 29 January 2026 |
| Application Deadline: | — |
| Enquiry Deadline: | 31 March 2026 |
| Procurement ID (OCID): | ocds-h6vhtk-061194 |
| Notice Reference: | 007858-2026 |
All 6 notices for this procurement, oldest first.
Framework for the provision of Planned & Preventative Maintenance M&E Services and Construction Works
Framework for the provision of M&E Services
Framework for the provision of M&E Services
Framework for the provision of M&E Services
Framework for the provision of M&E Services
Framework for the provision of M&E Services
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Unity Schools Partnership require Contractors to join their new framework to undertake M&E Services and Construction Works. The framework is split into 15 lots and any provider can attempt to join all or any of the services. The provider must always be in accordance with good industry practice so as to provide a high standard of service across the Trust for the benefit of the Trust's staff and pupils, the local community and to provide an inviting environment for visitors.
The supply of materials and labour to carry out all elements of electrical works including but not limited to all electrical works in connection with incoming supply. This includes out of hours cover 24/7 365 days. The testing for PAT testing & fixed electrical testing. Electricians should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed. Schools may require planned maintenance which the supplier shall manage with the school after an agreed call off schedule.
The supply of materials and labour to carry out inspection, test, service, maintenance and installation of access control and automatic doors / Dry risers / fire alarm systems / CCTV & intruder alarms / wet sprinkler / fire dampening / fire control equipment including minor enabling works. Contractors should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed. Schools may require planned maintenance which the supplier shall manage with the school after an agreed call off schedule.
The supply of materials and labour to carry out lift maintenance, inspection or specification for goods or passenger lifts including all works in connection with power, fitting of lifts, lift beams, lift rooms and testing, commissioning and certification including minor enabling works. Contractors should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed. Schools may require planned maintenance which the supplier shall manage with the school after an agreed call off schedule.
The supply of materials and labour to carry out plumbing and heating works including but not limited to mains water, secondary water, heating systems, foul water, internal and external works to provide services and enabling works. Contractors should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed. Schools may require planned maintenance which the supplier shall manage with the school after an agreed call off schedule.
The supply of materials and labour to carry out works to install air conditioning systems, there testing, inspection, servicing and maintenance and removal including small scale enabling works. Servicing and Inspection of systems including Legionella Testing. This includes Kitchen & Bathroom ventilation, AHU's and extract systems. Contractors should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed. Schools may require planned maintenance which the supplier shall manage with the school after an agreed call off schedule.
The supply of materials and labour to carry out Legionella risk assessment and control, water sampling and analysis, water tank inspection and refurbishment. Water treatment products and equipment and training and consultancy services. Contractors should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed. Schools may require planned maintenance which the supplier shall manage with the school after an agreed call off schedule.
Asbestos surveys and removal, damp surveys and treatment, dry rot survey and treatment and damp proofing including minor enabling works Contractors should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed.
The supply of materials and labour to carry out general roofing repairs gutters downpipes, hoppers and to carry out more major repairs such as reroofing. To carry out general repairs to drainage systems and install new systems when required including CCTV surveying and leak detection. Clean foul tanks and carry out any repairs.
To carry out annual lightning protection inspections and to supply materials and labour to carry out repairs. Contractors should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed.
Inspections and maintenance of Swimming Pools and equipment including plant
External and internal cleaning of windows and doors on Unity sites.
Inspection and testing of EyeBolt and fall arrest systems and to carry out any repairs. Contractors should issue certificates to confirm the safety and compliance of their work within 48 hours of works being completed.
School and office kitchen inspections and maintenance. Annual deep cleaning of kitchen equipment and ventilation.
The supply of materials and labour to carry out general builders work including all of the above but not limited to such and items such as internal and external demolition, reinstatement, Playground equipment removal or installation, window and door replacement, building of walls, forming and chasing, plastering and other construction related works up to the value of £300,000.
The supply of materials and labour to carry out general builders work including all of the above but not limited to such and items such as internal and external demolition, reinstatement, Playground equipment removal or installation, window and door replacement, building of walls, forming and chasing, plastering and other construction related works over the value of £300,000.
Published contracts in the last 12 months
8
total contracts
£12.1m
total value
£1,728,571
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£1,500,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →