Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | Kilnbridge Construction Services Ltd |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £250,000 |
| Release Date: | 12 December 2025 |
| Application Deadline: |
| 5 January 2026 |
| Contract Start Date: | 7 September 2026 (Estimated) |
| Contract End Date: | 19 July 2028 (Estimated) |
| Contract Duration: | 1.9 years |
| Procurement ID (OCID): | ocds-b5fd17-24cc8a24-b7ee-419c-8d08-b11299af111f |
| Notice Reference: | 424696e4-0e0a-4a27-b744-802fe13ba2e3-875803 |
View Original Notice
Access the full notice on the official portal
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of various bird netting and stainless steel balustrade infill panels to satellite buildings around the station complex. Those buildings include the following: • East Vent 1 • East Vent 5 • North Portal • South Portal • Train crew and catering • West Core • West Vent 1 • West vent 2 • East Core • Stainless steel grade 316 (grade 1.4401) netting • The system shall include all fixings, straps, clips, springs and any other accessories required to install the netting to the primary or secondary structure to the required specification. The Works shall effectively and reliably keep the façade and roof areas free from: • Bird habitation • Bird perching • Bird fouling The Works shall comply fully with the requirements of: • The Department for Environment, Food and Rural Affairs (Defra). • The Royal Society for the Prevention of Cruelty to Animals (RSPCA). • The Royal Society for the Protection of Birds (RSPB). • The Wildlife and Countryside Act 1981. The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing (if req'd), manufacture and installation of bird deterrent systems • Must meet the requirements for durability set out within the specification. • Works include also mock ups, samples and quality benchmarks. The Subsubcontractor will be responsible for progressing the schedule and associated Stage 4 drawings through design for manufacture and installation of bird netting and design and supply of stainless steel balustrade infill panels. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements. The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the sub subcontract works and the provision of sufficient temporary protection of the finished systems were required. Roof covering 1600+ sqm. Construction is to be carried out over a 2 year period commencing in Q3 2026 and completing in Q3 2028. Multiple visits will be required over this period.
Document pack· 1 file
Published contracts in the last 12 months
4
total contracts
£1.9m
total value
£462,500
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
5 January 2026
Closed
Estimated Value
£250,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →