| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | SONI Ltd |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Following review by the Regulatory Authorities of the TSOs’ Report on Ensuring a Secure, Reliable and Efficient Power System in July 2011 the TSOs were requested by the SEM Committee to put in place a programme of work to solve the challenges associated with increased levels of penetration of variable non-synchronous renewable generation.
Primary Operating Reserve or 'POR' has the meaning given to it in the grid code
Secondary Operating reserve or 'SOR' has the meaning given to it in the grid code
Tertiary 1 operating reserve or 'TOR1' has the meaning given to it in the grid code.
Published contracts in the last 12 months
17
total contracts
£135.5m
total value
£10,424,922
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
15 January 2026
Closed
Estimated Value
£34,450,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £34,450,000 |
| Estimated Value (inc. VAT): | £41,340,004 |
| Release Date: | 12 December 2025 |
| Application Deadline: | 15 January 2026 |
| Enquiry Deadline: | 18 December 2025 |
| Procurement ID (OCID): | ocds-h6vhtk-05f475 |
| Notice Reference: | 082303-2025 |
All 2 notices for this procurement, oldest first.
SONI074 DS3 System Services – Volume Capped – Gate 14
SONI074 DS3 System Services – Volume Capped – Gate 14
View Original Notice
Access the full notice on the official portal
Tertiary 2 operating reserve or 'TOR2' has the meaning given to it in the grid code
RR (De-synchronised)' means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (ii) when connected to the power system in the case of a demand side unit
RR (Synchronised)' means Replacement Reserve provided by the Providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module. II.2.5) Award criteria
Steady-state reactive power or 'SSRP' means reactive power capability (Leading) and reactive power capability
Synchronous Inertial Response (SIR) is the kinetic energy (at a Frequency of 50 Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR factor (SIRF)
Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to the company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest availability in that three hour period.
Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within three hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period
Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period.
Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event.