Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | The North Yorkshire Council |
| Main Category: | Works |
| Procurement Method: | Restricted procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 11 December 2025 |
| Application Deadline: | 7 August 2025 |
| Contract Start Date: | 30 September 2025 |
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award value: | £683,481.95 |
| Award decision date: | 11 December 2025 |
| Award status: | Active |
Works include 6 schemes with drainage works as follows: Scheme 1: A59 Skipton Road - The works include clearing the overgrown vegetation from the existing ditch and its surroundings, cleaning out existing gullies and the pipe work connections that outfall into ditch and repairing the damaged ditch sides. Scheme 2: Shaw Lane - The works include pavement haunching, providing unlined drainage grips and concrete lined drainage grips with kerbs and reinstatement of verges followed by grass seeding. Scheme 3: Low Green Darley - Replace 150mm dia drain pipe and reconstruct the Carriageway and Footway, Verge build up at some locations Matching the Existing Layers, Replace the iron works and associated civil works across all sites. Scheme 4: Weeton Lane - Undertake carriageway resurfacing and setting up gully connection along with the adjustment. Scheme 5: York Road - Replace 150mm dia drain pipe and reconstruct the carriageway and footway matching the existing layers and replace the iron works and associated civil works across all sites. Scheme 6: Ripon Road, Wormald Green - The works include replacing a 150mm dia. carrier pipe with 225mm dia. carrier pipe, installation of 2No additional 150mm dia. Drain pipes and connecting to 225mm dia. Carrier pipe. Reconnection of existing gullies and reinstatement of carriageway and associated civils works. Further information is contained within the Specification (See Drainage Spec A6) and the Contract Management Suite (See Area 6 Drainage - CECF2021 Contract Management Suite) which contains the Contract Data Part 1, Additional Scope, Site Information, Early Warning Register and CDM Pre-construction stage information.
Published contracts in the last 12 months
664
total contracts
£1925.5m
total value
£13,753,508
average contract size
Typical categories
North Yorkshire Adult Social Care - Thriving Care Homes Framework
The North Yorkshire Council · WAC-641126
DFG Lifting Equipment
The North Yorkshire Council · WAC-640760
Vouchers for the supply of E-Cigarettes and associates products - 851-NYC-HA
The North Yorkshire Council · WAC-639535
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
7 August 2025
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract End Date: |
| 6 February 2026 |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-bda538bf-692d-400e-a812-1a808cdb6be1 |
| Notice Reference: | 3fd562c4-5331-4956-8c1f-41197c105ef4-875635 |