Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | ENVIRONMENT AGENCY |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 1 December 2025 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-05860b |
All 4 notices for this procurement, oldest first.
Cement Kilns Destruction Efficiency of Persistent Substances
Cement Kilns Destruction Efficiency of Persistent Substances
Cement Kilns Destruction Efficiency of Persistent Substances
Cement Kilns Destruction Efficiency of Persistent Substances
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award status: | Active |
The purpose and scope of the project is to undertake a study to determine the destruction efficiency (DE) and destruction and removal efficiency (DRE), for specified POPs and per-and polyfluoroalkyl substances (PFAS) chemicals, in relevant waste related materials, at two UK cement kilns that use waste as a fuel. This will be achieved by feeding representative waste materials containing high levels of the relevant POPs and PFAS into the process and measuring their presence in all products, residues, emissions and releases that are outputs of the process, without compromising cement clinker quality. The project will also quantify releases or emissions of chemicals indicative of sub-optimal or incomplete destruction of POPs and PFAS. The work will involve: • In year 1, preparing the sampling plan for testing in year 2. This will require identifying and obtaining suitable waste materials, containing sufficient POPs and PFAS, visiting participating cement kilns to understand processes and access points, and identifying suitable laboratories and analytical methods. This should be completed by the end of February 2026. • In year 2, undertaking testing, sampling and laboratory analysis for the first cement kiln. This should be completed, with an interim report submitted, by the end of February 2027. • In year 3, adapting the approach as needed from the previous year, and undertaking testing, sampling and laboratory analysis for the second cement kiln. This should be completed with a final report submitted by the end of February 2028.
Published contracts in the last 12 months
237
total contracts
£34952.9m
total value
£332,884,830
average contract size
Typical categories
Asset Operation Maintenance and Response Framework 2
ENVIRONMENT AGENCY · WAC-642677
Ground Care, Agricultural and Plant Equipment for Defra Group Fleet Services
ENVIRONMENT AGENCY · WAC-641280
Ground Care and Plant for Defra Group Fleet Services
ENVIRONMENT AGENCY · WAC-641285
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Notice Reference: |
| 078384-2025 |