Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | North East London NHS Foundation Trust |
| Main Category: | Works |
| Procurement Method: | Below threshold - unknown |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Not specified |
| Release Date: | 17 November 2025 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-05e214 |
| Notice Reference: | 074228-2025 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award status: | Active |
The works include the full strip-out, refurbishment, and reinstallation of sanitary fittings, finishes, and associated building and plumbing works to the existing toilet area. 1. Strip Out and Preparation a. Strip out and remove existing toilet, sink, and associated fittings. b. Carry out full demolition/soft strip of redundant fixtures, finishes, and pipework as required. c. Remove existing internal door and door furniture. d. Dispose of all waste materials in accordance with site waste management and environmental regulations. e. Make good all disturbed areas to a sound and even finish ready for decoration. 2. Windows a. Make good 2 no. existing windows, including repair of frames, cleaning, sealing, and preparation for decoration as required. 3. Decoration a. Prepare all wall, ceiling, and wood surfaces. b. Apply one mist coat and one full coat of quality trade emulsion to walls and ceilings. c. Apply suitable finish paint to all woodwork, trims, and window frames. 4. Joinery Works a. Refurbish existing door, including sanding, filling, repainting/staining, and fitting new door furniture (handle, lock, and signage). b. Install shelving to support new water heater - securely fixed, level, and able to support full load of the appliance. c. Construct and install heater cover (removable for access and maintenance), finished to match surrounding décor. d. Carry out any required boxing-in of pipework to provide a neat and accessible finish. 5. Plumbing Works a. Supply and install new close-coupled WC suite, including pan, cistern, seat, and all fixings. b. Supply and install new sink with thermostatic mixing tap. c. Supply and install new 15-litre electric water heater. d. Complete all associated pipework, waste, and lagging to meet current Building and Water Regulations. e. Pressure test system upon completion. 6. Mechanical Works a. Core hole through external wall for new extract fan installation (fan to be supplied separately or as specified). b. Seal all penetrations weather-tight and make good finishes. 7. Completion a. Ensure all works are clean, fully operational, and tested. b. Remove all rubbish and debris from site. c. Provide user instructions for all new equipment (heater, tap, etc.). d. Leave area ready for immediate use
Published contracts in the last 12 months
91
total contracts
£7.4m
total value
£673,727
average contract size
Typical categories
NELFT Voluntary and Community Sector (VCS) Core Community Service (Havering).
North East London NHS Foundation Trust · WAC-636809
RA327931 - Individual Coaching
North East London NHS Foundation Trust · WAC-619660
NELFT - Outsourced Clinical Transcription RFI
North East London NHS Foundation Trust · WAC-606564