Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | Home Office |
| Main Category: | Goods |
| Procurement Method: | Below threshold - without competition |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 10 April 2025 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-050048 |
All 2 notices for this procurement, oldest first.
E Series pump modification kit from PVT10D to PVT10E design for Stabiliser system for the proposed duration – 28/03/2025 – 31/03/2026
E Series pump modification kit from PVT10D to PVT10E design for Stabiliser system for the proposed duration – 28/03/2025 – 31/03/2026
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award status: | Active |
The current Naiad Stabiliser system onboard the Border Force 4207 patrol vessels are made up of a High Pressure Unit (HPU) with hydraulic pump, sea water cooling pump and 2 fins. The hydraulic pump circulates high pressure hydraulic oil to the fins which are mounted through the vessels hull underwater and reduces the rolling and rocking motion caused by waves, currents or wind. • The current hydraulic pumps used on the stabiliser system onboard the Damen 4207 Cutters have been made obsolete and all existing spares have been depleted, a replacement pump with modification kit is required that will bolt onto our existing Naiad system equipment to keep stabiliser function onboard the cutters and ensure safe operation of the system and vessel when at sea. • Naiad Dynamics is the original equipment manufacturer in the UK for the stabilizer control system and is in possession of the intellectual property and exclusive rights as OEM of the system used on the Damen 4207 Cutters. The services are not part of any catalogue, OGD framework or dynamic purchasing system. • The use of Naiad Dynamics is to assure the serviceability of crucial systems on board our Cutters. Due to the current operating model and levels of usage OEM parts, systems and sub-assemblies should be used to service BF Cutters when a break down occurs. As a result, warranty claims both retrospective and in the future, are a main factor in ensuring that these systems are afforded the most reactive and comprehensive support available that is assured. • Without the assured serviceability of these vessels, people and illicit goods may be successful in penetrating the coastline controls without being interdicted. Inability to deploy the vessel will significantly reduce the capability of BF Maritime Command to adequately protect the UK EEZ boundary. Introduction of a third-party suppliers would allow for technically unacceptable fluctuations in the standard of parts, labour and certification services required on these systems. If we did not use an OEM for this the reliability would drop and the likelihood of catastrophic failure would increase.
Published contracts in the last 12 months
766
total contracts
£19186.3m
total value
£39,723,148
average contract size
Typical categories
HMC VALIANT Maintenance and Safety Equipment Recertification (MSER)
Home Office · WAC-641505
Request for Information (RFI) Exercise for Home Office Quality Assurance & Testing (QAT) Contracts
Home Office · WAC-640971
Global Tuberculosis Screening Service
Home Office · WAC-639421
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Notice Reference: |
| 014174-2025 |