Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Costain Limited (H7-Heathrow) |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £500,000 |
| Release Date: | 31 October 2025 |
| Application Deadline: | 6 November 2025 |
| Contract Start Date: | 2 July 2026 (Estimated) |
| Contract End Date: | 9 December 2026 (Estimated) |
| Contract Duration: | 5 months |
| Procurement ID (OCID): | ocds-b5fd17-a01b101c-8642-42ac-bd74-cb7eb6b7f705 |
| Notice Reference: | b8c1406f-2bb6-4062-877b-429436f8248a-870418 |
View Original Notice
Access the full notice on the official portal
Soft Landscaping There is a requirement for a subcontractor who can support us with our soft landscaping requirements. Removal of existing undergrowth on embankment side and replanting with hedera hibernica (circa 1150m2). Works include working on steep incline (typically 1:1.6) using fixed line system or similar. Works are immediately adjacent/above services including high pressure fixed fire supression systems and immediately adjacent to live highway traffic and footpaths. Supplier will be responsible for fertiliser, weed suppression mat, irrigation system (inc design) and planting of new vegetation. Please find our GA for soft landscaping Hard Landscaping There is a requirement for some hard landscaping which will include the lay of permeable black tarmac surface for evacuation area, circa 370m2. There is also "road kerb & furniture modification" and a fair amount of edge protection and security fencing. There is a also a road kerb & furniture modification" requirement as well as edge protection which may form part of this package. The scope is still under development
Published contracts in the last 12 months
17
total contracts
£13.3m
total value
£779,412
average contract size
Typical categories
WP3380- Hard Landscaping (lot 1), Soft Landscaping (lot 2), & Kerb modifications (lot 3) and edge protection - CTA Main Works
Costain Limited (H7-Heathrow) · WAC-513499
WP3380- Hard Landscaping (lot 1), Soft Landscaping (lot 2), & Kerb modifications (lot 3) and edge protection - CTA Main Works
Costain Limited (H7-Heathrow) · WAC-513503
WP4730 - Security Fencing CTA Tunnel
Costain Limited (H7-Heathrow) · WAC-513561
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
6 November 2025
Closed
Estimated Value
£500,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →Apply online