Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Environment Agency |
| Main Category: | Services |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
24 September 2025
Closed
Estimated Value
£53,004.25
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £53,004.25 |
| Release Date: | 28 October 2025 |
| Application Deadline: | 24 September 2025 |
| Contract Start Date: | 27 October 2025 |
| Contract End Date: | 31 March 2026 |
| Contract Duration: | 5 months |
| Procurement ID (OCID): | ocds-b5fd17-f1bc626d-ed1f-4168-a165-34bf408873e1 |
| Notice Reference: | 3cb87ead-07a8-4607-a4d1-c0c9d5df9d39-869760 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £53,004.25 |
| Award decision date: | 27 October 2025 |
| Award status: | Active |
The Pont and Blyth Rivers flow eastwards through south Northumberland, entering the North Sea at the town of Blyth. Both rivers have a long history of management by the Environment Agency (EA), National Rivers Authority, Northumbrian Water and the Catchment Boards resulting in significant degradation of the rivers and associated water dependent habitats across the catchments. The impact of this historical management is evident through the current Water Framework Directive (WFD) status of the waterbodies across the catchment with 14 waterbodies at moderate WFD status (of which 7 are heavily modified) and 1 at poor WFD status The Pont Ends Project aims to support an improvement in the WFD status of the Blyth from Pont to Tidal Limit waterbody (GB103022077052). This waterbody is designated as a heavily modified waterbody, currently at moderate WFD status. Historical management across the waterbody has included extensive dredging, the installation of extensive flood embankments and disconnection of the river from its floodplain through channel straightening as well as extensive land drainage. This management was primarily delivered to protect agricultural land and aid in the intensification of agriculture.
Published contracts in the last 12 months
641
total contracts
£551.8m
total value
£919,597
average contract size