Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | Devon County Council |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
4 December 2025
Closed
Estimated Value
£6,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £6,000,000 |
| Estimated Value (inc. VAT): | £7,200,000 |
| Release Date: | 10 October 2025 |
| Application Deadline: | 4 December 2025 |
| Procurement ID (OCID): | ocds-h6vhtk-051835 |
| Notice Reference: | 064244-2025 |
All 5 notices for this procurement, oldest first.
B3181 Baulk Bridge Replacement
B3181 Baulk Bridge Replacement
B3181 Baulk Bridge Replacement
B3181 Baulk Bridge Replacement
B3181 Baulk Bridge Replacement
View Original Notice
Access the full notice on the official portal
Awarded to
| Award status: | Active |
This contract requires a replacement bridge to replace the existing one on the B3181. The existing bridge is in poor condition and previous investigations have determined it is not economical to repair and therefore a new replacement bridge is required, with a 120-year design life. The replacement will be located on a new alignment to allow for the existing road to remain open for a significant time during construction, without the need to severely interrupt traffic flows or to provide a temporary bridge. The requirement for a replacement bridge provides an opportunity to improve the highway alignment by locating the bridge downstream of the existing bridge, via 320m of realigned carriageway. It will also allow for 320 metres of improved pedestrian facilities and vehicular containment that could not be achieved within the footprint of the existing bridge. Once completed the existing bridge and redundant road section will be removed to improve flood conveyance and storage. The scheme also includes highway associated drainage, a flood relief culvert and ecological habitat enhancements.
Document pack· 1 file
Published contracts in the last 12 months
236
total contracts
£15275.6m
total value
£132,831,501
average contract size
Typical categories
CP2771-26 - Coroners Service Body Transportation
Devon County Council · WAC-637132
CP2632-25 Open Light Touch Framework for the Provision of Short Breaks for Disabled Children and Young People in Devon
Devon County Council · WAC-631224
CP2549-24 Devon and Somerset Standing List of Approved Contractors (SLoAC) Reopening 2026
Devon County Council · WAC-630490