Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | MINING REMEDIATION AUTHORITY |
| Main Category: | Services |
| Procurement Method: | Call-off from a dynamic purchasing system |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
18 August 2025
Closed
Estimated Value
£57,507
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £57,507 |
| Release Date: | 23 September 2025 |
| Application Deadline: | 18 August 2025 |
| Contract Start Date: | 21 September 2025 |
| Contract End Date: | 31 March 2026 |
| Contract Duration: | 6 months |
| Procurement ID (OCID): | ocds-b5fd17-431c14f6-92eb-4331-9815-c9a44b552ada |
| Notice Reference: | 4fec40c0-b31d-4fe6-a65e-76344c1f1682-865033 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £57,507 |
| Award decision date: | 14 September 2025 |
| Award status: | Active |
This requirement is for the Minsterley Surface Water Diversion - The Minsterley Brook catchment comprises an extensive area of former mines in South Shropshire. Sampling by Environment Agency (EA) shows mine water discharges to contain elevated levels of metal pollutants. The Mining Remediation Authority is proposing to install a surface water diversion pipeline as part of works to reduce metal pollution in the catchment. In addition the works will involve the following: • Installation of a new below ground HDPE pipe approximately 53m in length; • Modification (grouting) of existing culvert; • Installation of penstock gates in surface drain to control waters; • New manhole chamber and inlet headwalls; • Construction of outlet headwall; • Testing and commissioning (including CCTV and hydraulic flow tests); • Temporary working compound and drainage isolation and diversion measures; • Site restoration • Disposal of arising (potentially some contaminated material); This contract has been let following a further competition from the Pagabo Small Works DPS
Published contracts in the last 12 months
24
total contracts
£15.1m
total value
£718,756
average contract size
Typical categories