Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | United Utilities Water Limited |
| Main Category: | Services |
| Procurement Method: | Restricted procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 16 September 2025 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-04445c |
| Notice Reference: | 057076-2025 |
All 5 notices for this procurement, oldest first.
PRO004672- DPS- Liming Treatment of Wastewater Sludge Services
PRO004672- DPS- Liming Treatment of Wastewater Sludge Services
PRO004672- DPS- Liming Treatment of Wastewater Sludge Services
PRO004672- DPS- Liming Treatment of Wastewater Sludge Services
PRO004672- DPS- Liming Treatment of Wastewater Sludge Services
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to (2 suppliers)
| Award status: | Active |
Suppliers can apply to join an active DPS at any time during its operating period. Successful applicants are eligible to bid for individual call-off contracts.
United Utilities are seeking to implement a DPS for liming treatment of Wastewater sludge’s both on and off company site. Liming may be utilised as an alternative treatment of sludge to manage capacity shortfalls and increased production demand during planned/unplanned shutdowns. The Company has an estimated 30,000 – 50,000 wet tonnes of raw sludge per year that requires alternate treatment and / or disposal. Each mini competition within the DPS will be specific each site’s specific needs, however it is anticipated that requirements shall include but not limited too: liming plant equipment, lime, permits (subject to site and lot) and resource to deliver the limed sludge treatment services. The DPS will consist of 2 lots: Lot 1: On-site lime treatment Lot 2: Off-site lime treatment
Please refer to Requirement Scopebook for further detail United Utilities are seeking to implement a DPS for liming treatment of Wastewater sludge’s both on and off company site. Liming may be utilised as an alternative treatment of sludge to manage capacity shortfalls and increased production demand during planned/unplanned shutdowns. The Company has an estimated 30,000 – 50,000 wet tonnes of raw sludge per year that requires alternate treatment and / or disposal. Each mini competition within the DPS will be specific each site’s specific needs, however it is anticipated that requirements shall include but not limited too: liming plant equipment, lime, permits (subject to site and lot) and resource to operate the liming plant and deliver the limed sludge treatment services.
Please refer to Requirement Scopebook for further detail United Utilities are seeking to implement a DPS for liming treatment of Wastewater sludge’s both on and off company site. Liming may be utilised as an alternative treatment of sludge to manage capacity shortfalls and increased production demand during planned/unplanned shutdowns. The Company has an estimated 30,000 – 50,000 wet tonnes of raw sludge per year that requires alternate treatment and / or disposal. Each mini competition within the DPS will be specific each site’s specific needs, however it is anticipated that requirements shall include but not limited too: liming plant equipment, lime, permits (subject to site and lot) and resource to operate the liming plant and deliver the limed sludge treatment services.
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →