Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
23 August 2024
Closed
Estimated Value
£200,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £200,000 |
| Release Date: | 15 September 2025 |
| Application Deadline: | 23 August 2024 |
| Contract Start Date: | 10 August 2025 |
| Contract End Date: | 22 September 2025 |
| Contract Duration: | 1 month |
| Procurement ID (OCID): | ocds-b5fd17-d14bc6c6-ff8a-43b6-9326-fe4aecafe3eb |
| Notice Reference: | c4935228-9325-42a3-9735-cff15ab9cbe8-863527 |
All 5 notices for this procurement, oldest first.
GMCA 824 Access Road
GMCA 824 Access Road
GMCA 824 Access Road
GMCA 824 Access Road
GMCA 824 Access Road
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £155,499.48 |
| Award decision date: | 14 October 2024 |
| Award status: | Active |
Link to the Chest:https://www.the-chest.org.uk/\\r\r \\r\r The works are located, within land owned by Greater Manchester Combined Authority (GMCA). A 900mm culverted pipe is located beneath the existing Chichester Street Recycling Centre site at Rochdale. The culvert consists of two sections running from south to north conveying combined water flows from an upper catchment area in Rochdale and discharges to the River Roch. GMCA are currently working on a project to survey a section of the culvert, which would need arranging for a tanker to jet and cleanse a blocked section of the culvert, accessed from MH6. A new access road would be needed to allow the tanker to undertake the pipe maintenance. The scope of the project is as follows:\\r\r \\r\r Road Construction Works\\r\r \\r\r The scope of the works includes, but is not limited to:\\r\r \\r\r Setting up working areas\\r\r Demarcation of site boundary and provision of signage.\\r\r Traffic management of works in or affecting public highway/open areas/car parks.\\r\r Confirm line and level of existing surface water drainage system.\\r\r Survey existing manholes and propose means of connecting proposed road drainage system to existing surface water drainage system.\\r\r Undertake setting out procedures.\\r\r Carry out tree felling.\\r\r Site compaction trial.\\r\r Earthworks and grading to formation level.\\r\r Laying the geogrid combined separator as per the road detail.\\r\r Prepare subbase, base course, and surface layer.\\r\r Testing and quality control.\\r\r \\r\r Test and dispose of excavated material off site.\\r\r The Works are described in greater detail on the drawings.
Published contracts in the last 12 months
465
total contracts
£585.0m
total value
£4,148,664
average contract size
Typical categories
GMCA 2087 GM Inclusion Health Services: Co-occurring Conditions Support Services
Greater Manchester Combined Authority · WAC-642478
GMCA1832 Supply of Self-Contained Breathing Apparatus (SCBA) and Associated Equipment and Services
Greater Manchester Combined Authority · WAC-642624
GMCA 1441 Public Analyst Services & Emergency Call Out Service
Greater Manchester Combined Authority · WAC-640870