Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | Kilnbridge Construction Services Ltd |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £500,000 |
| Release Date: | 4 September 2025 |
| Application Deadline: | 11 September 2025 |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
11 September 2025
Closed
Estimated Value
£500,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract Start Date: | 27 March 2026 (Estimated) |
| Contract End Date: | 26 March 2027 (Estimated) |
| Contract Duration: | 1.0 years |
| Procurement ID (OCID): | ocds-b5fd17-8a01bc23-ff2c-4fa2-9ab8-3e551d2028bc |
| Notice Reference: | 9c4a1667-7de9-41c2-8bab-b93f9f148938-862252 |
View Original Notice
Access the full notice on the official portal
Kilnbridge have secured the HS2 Old Oak Common Station Works Package for the construction of Urban Realm elements and the Head Houses and Ancillary Buildings. Part of these works require the installation of two, precast concrete attenuation tanks to the eastern part of the site. These tanks are a Subcontractor's design portion. Eastern HS2 Attenuation Tank • Area 1115m2 • Volume 1165m3 • Tank Depth 1.1m • Void Ratio 0.95 Eastern HS2 Dirty Water Tank • Area 1115m2 • Volume 350m3 • Tank Depth 1.6m • Void Ratio 0.95 Kilnbridge are seeking the services of suitably qualified and experienced Sub-subcontractor who shall be responsible for developing the Contractors Detailed Design to Design for Construction & Manufacturing. Taking from RIBA 4 to RIBA 5 stage. The Sub-subcontractor shall be responsible for providing their own design and design for construction drawings, compliant with the design intent of the Contractors Designer. The Sub-subcontractor will be responsible for ensuring the submission and acceptance of their design from the Contractor and Contractor's design consultant through the Subcontractor. Works include the design , manufacture and supply of precast base, walls and roof units to site. Scope to include for, but not limited to, technical assurance, BIM modelling, asset scheduling and labelling, drawings for approval, as built drawings, indicative construction sequence methodology, submission of design packs, material approvals, and sustainability and environmental management. Sub-subcontractor to interface their design with incoming services as detailed on the construction drawings. Construction is currently forecasted to be carried Q2 2026
Document pack· 1 file
Published contracts in the last 12 months
4
total contracts
£1.9m
total value
£462,500
average contract size
Typical categories