Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Balfour Beatty VINCI Systra JV |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
| £10,000,000 |
| Release Date: | 21 August 2025 |
| Application Deadline: | 29 August 2025 |
| Procurement ID (OCID): | ocds-b5fd17-b9e74b50-fd16-4bb2-9e8b-7bc6a60c5dbb |
| Notice Reference: | 44b34daa-4df3-432a-8263-cf7c34fde72a-860311 |
View Original Notice
Access the full notice on the official portal
WP15 Final highways scope The OOC Lane realignment & Final highways scope package consists of: Removal of all existing highway surfacing and street furniture (is there any to be retained / relocated or does it include disposal?) Installation of any temporary critical highway furniture (e.g. Street Lighting, Barriers) required to carry out the works Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence. The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing All temporary works required for the construction of the works, including any access requirements Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements Removal and disposal of all current utilities in the highway. Installation of OOC Lane footpath retention structures Installation of any other required Highway Civils Installation of all highway and foul drainage Installation of UKPN 132kV & 33kV duct routes, inclusive of any tunnel / subterranean system and the required temporary works The removal of any installed temporary works and the construction of the highway The installation of all highway furniture and its required infrastructure (traffic lights incl of ducting, islands, street lighting incl of ducting etc) Removal of temporary works installed by others to facilitate utility connections at the north and south end of the
Document pack· 1 file
Published contracts in the last 12 months
6
total contracts
£49.0m
total value
£8,166,667
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
29 August 2025
Closed
Estimated Value
£10,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →