| Notice Type: | Award update |
| Buyer: | Ministry of Justice |
| Main Category: | Services |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
30 March 2023
Closed
Estimated Value
£9,374,520.8
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £9,374,520.8 |
| Release Date: | 21 August 2025 |
| Application Deadline: | 30 March 2023 |
| Contract Start Date: | 1 May 2023 |
| Contract End Date: | 30 December 2025 |
| Contract Duration: | 2.7 years |
| Procurement ID (OCID): | ocds-b5fd17-a45a17de-1aaa-430c-8b17-a67cb59072ea |
| Notice Reference: | 3f215499-f89b-47fc-a861-e485abf9bb93-860378 |
All 2 notices for this procurement, oldest first.
Interim Hosting Dedicated (Private) Cloud Service
Interim Hosting Dedicated (Private) Cloud Service
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £9,374,520.8 |
| Award decision date: | 1 May 2023 |
| Award status: | Active |
The procurement is seeking a new contract to replace the current Interim Public Hosting contract as it has been identified that the solution provided was unable to meet the originally stipulated requirements. During the mobilisation and detailed Low-Level Design (LLD) phase, it became apparent that public cloud was not adequate to address risks, especially the security associated with hosting of the legacy applications. This has meant the need to change from a Public Cloud to a Private Cloud environment to allow for the requirements to be met and enable the exit of the legacy hosting service within the required timeframes. A new contract is required to deliver the Interim Hosting requirements and enable the safe exit of the legacy Vodafone hosting service within the required timeframes. Without the provision of Interim Hosting there is no practical and affordable way that the Vodafone data centre exit can be achieved within the current Hosting contract term.
Published contracts in the last 12 months
1,058
total contracts
£276477.8m
total value
£389,954,573
average contract size
Powder Coating System for Prison Industries Workshop at HMP Wymott
Ministry of Justice · WAC-639650
Powder Coating System for Prison Industries Workshop at HMP Wymott
Ministry of Justice · WAC-638772
The Supply of Injection moulding Machines to HMP Ranby
Ministry of Justice · WAC-638402