Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | Ferrovial BAM Rail Systems |
| Main Category: | Goods |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £50,000,000 |
| Release Date: | 7 July 2025 |
| Application Deadline: | 18 July 2025 |
| Contract Start Date: | 13 September 2025 (Estimated) |
| Contract End Date: | 28 January 2028 (Estimated) |
| Contract Duration: | 2.4 years |
| Procurement ID (OCID): | ocds-b5fd17-a98f9177-e686-429f-8c94-37b01468413e |
| Notice Reference: | 78e68f46-e757-4d92-bffa-48b57ba27b9e-853125 |
View Original Notice
Access the full notice on the official portal
As part of the track system packages for each lot, Ferrovial BAM JV will be procuring all permanent way materials including the precast slab system for the switches and crossing units (S&C) and rail expansion devices (RED's). The supplier of the ironwork for the S&C & RED's is set by HS2 (VoestalpineTurnout Technology). The scope allocation/responsibility split for Standard Slabtrack between Others design and the Supplier for design is indicated as attached. This includes, but is not limited to bearers/slabs, rail fastening systems and any supporting layers above the Frost Protection Layer (FPL), structure deck or stations provided by Others, including any reinforcement if applicable. The scope allocation/responsibility split for Resilient Slabtrack between Others design and the Supplier for design is indicated as attached. This includes the supplier's resilient bearer or precast element (this would include any associated components such as reinforcement, resilient pads, boots), rail fastenings and S&C fixing arrangements. Additional information: Manufacturing and logistical strategy still to be discussed which will impact contract start and end date i.e. staggered production, early production with storage etc.
Document pack· 1 file
Published contracts in the last 12 months
10
total contracts
£84.0m
total value
£8,401,500
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
18 July 2025
Closed
Estimated Value
£50,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →