| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Ministry of Justice |
| Main Category: | Works |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
11 June 2024
Closed
Estimated Value
£995,637
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £995,637 |
| Release Date: | 24 June 2025 |
| Application Deadline: | 11 June 2024 |
| Contract Start Date: | 12 May 2025 |
| Contract End Date: | 31 May 2027 |
| Contract Duration: | 2.1 years |
| Procurement ID (OCID): | ocds-b5fd17-f6beff2a-6b59-4b08-9db4-57e06c239c44 |
| Notice Reference: | d216fdbb-2a2e-4cf5-afa1-83c429378b01-851233 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £995,637 |
| Award decision date: | 12 May 2025 |
| Award status: | Active |
HMP Leyhill has an old copper pipework infrastructure from the plant rooms to the wing and steel heating loops. All pipework feeding the heating's loops are below ground in a vaulted floor with very limited access. This comes up above the floor to the steel heating loop supplying heating to the cells on all spurs to A & B wings. (385 spaces). The pipework is over 40 years old & has worn so thin that it is regularly being perforated & leaking. Contractors are struggling to access the fractures & are having to cut access hatches into the concrete floor, where they can access the pipework. The pipework is often too thin to affect a repair & must be cut back several times before they are able to make a connection. The repair increases pressure & often cause a further leak a meter along the pipe within a very short period of time. There have been several leaks recently and as the Living block has no spare electrical capacity for emergency heaters & installing a generator close by would be noisy. Potentially we could be looking at a decant of a complete wing if the infrastructure is not addressed prior to a complete failure. A constructor has been appointed for the design and build of the project. This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract. The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology. The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £172,758.43.
Published contracts in the last 12 months
1,058
total contracts
£276477.8m
total value
£389,954,573
average contract size
Powder Coating System for Prison Industries Workshop at HMP Wymott
Ministry of Justice · WAC-639650
Powder Coating System for Prison Industries Workshop at HMP Wymott
Ministry of Justice · WAC-638772
The Supply of Injection moulding Machines to HMP Ranby
Ministry of Justice · WAC-638402