| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | THE PIRBRIGHT INSTITUTE |
| Main Category: | Services |
| Procurement Method: | Below threshold - without competition |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Not specified |
| Release Date: | 17 June 2025 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-054dff |
| Notice Reference: | 032844-2025 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award status: | Active |
The Brooksby Building is a newly constructed and completed large animal High. Containment (Level 4) facility, designed and engineered to achieve ACDP3 and SAPO4 bio-containment levels. The building is arranged with 6 large animal holding suites, with each animal holding suite comprising 4 individual rooms. As the "Occupation "Day 2" Projects" continues to progress, to provide Pirbright complete assurance of suitability for SAPO 4 / ACDP operation. At present this comprises of four areas: 1. Ventilation. A working group comprising Pirbright Ventilation, Process safety, BMS and Biosafety SMEs has been formed to undertake this performance verification. It is proposed that the 3rd party commissioning specialist will support this process in conjunction with the Brooksby ventilation installation & commissioning engineers. Accordingly, an allowance of 1 day per week to the end of December 2025 has been made, for a total of 20 days allowance. 2. Incinerator. The following estimates have been made to support the incinerator programme of works. This will bring the incinerator to a fully operational and commissioned condition, sufficient for SAPO 4 ACDP 3 studies to commence. - Commissioning, Validation & Verification, and supervision: 2 days /week. Incinerator total: 50 days 3. Safety Instrumented Function (SIF) installation & commissioning. - 5 days supervision and technical support. 4. Occupation and Work Package 2 works support. (Supporting on-site management & coordination of work activities & interdependencies, basement issues support, technical support, meetings and administration). - 7 days supervision and technical support. Total: 82 days (June 2025 - end December 2025) This period requires specialist technical support from those possessing detailed knowledge and experience of the Brooksby facility.
Published contracts in the last 12 months
76
total contracts
£4.6m
total value
£171,127
average contract size
Typical categories
Site Steam Management and Boiler Maintenance
THE PIRBRIGHT INSTITUTE · WAC-641586
ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
THE PIRBRIGHT INSTITUTE · WAC-640378
ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU)
THE PIRBRIGHT INSTITUTE · WAC-640379