Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST |
| Main Category: | Services |
| Procurement Method: | Below threshold - open competition |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £150,000 |
| Estimated Value (inc. VAT): | £180,000 |
| Release Date: | 28 May 2025 |
| Application Deadline: | 3 July 2025 |
| Contract Start Date: | — |
| Contract End Date: | — |
| Contract Duration: | NaN years |
| Procurement ID (OCID): | ocds-h6vhtk-052860 |
| Notice Reference: | 028267-2025 |
All 4 notices for this procurement, oldest first.
CUE & Butterfly House Decarbonisation
CUE & Butterfly House Decarbonisation
CUE & Butterfly House Decarbonisation
CUE & Butterfly House Decarbonisation
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £91,827 |
| Award decision date: | — |
| Award status: | Active |
The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016. The Horniman wish to partner with a design and engineering supplier who will support the decarbonisation of the above listed buildings. Works include: Design works in line with RIBA stages 3-6: Main Designer role: - developing the outline design. - Determine the requirement on planning application and listed building consent. - detailed design drawing package. - prepare tender package and specifications for installation. - evaluate tender package and monitor and report on the cost plan. - appoint and manage the design team (M&E engineer, Structural engineer). - coordinate with the design team. - updating design while on site. - coordinate design changes. Project management and coordination: - coordinating the design development approval between the design team, The Horniman team and Salix (distributors of Public Sector Decarbonisation Fund Phase 4). - coordinating the works implementation & program between the museum team, the contractor and Salix. Principal Designer under CDM and Building Regulations: - Building control application preparation and submission. - PD duties for both CDM and Building Regulations. - PD duties for both CDM and Building Regs including the preparation and share of the Health and Safety File. - Organise Building control visit and share information at key stages. Contract Administrator (traditional route contract) or Employer's Agent (D&B contracts) - responsible for administering the construction contract including (non- exhaustive list): drafting contract documents for execution, issuing instructions, considering claims for extension of time, issuing certificates interim certificates for payment, practical completion certificates, etc
Document pack· 1 file
Published contracts in the last 12 months
13
total contracts
£4.9m
total value
£488,200
average contract size
Typical categories
CUE & Butterfly House Decarbonisation
THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST · WAC-577091
CUE & Butterfly House Decarbonisation
THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST · WAC-570963
CUE & Butterfly House Decarbonisation
THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST · WAC-570199
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
3 July 2025
Closed
Estimated Value
£150,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →