| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | Derby City Council |
| Main Category: | Works |
| Procurement Method: | Below threshold - without competition |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| Not specified |
| Release Date: | 9 May 2025 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-050f72 |
| Notice Reference: | 019964-2025 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award status: | Active |
Openreach Utility Diversion - Derwent Street, Derby 1 Civil Engineering Works 1.1 Duct Diversion New ducts of an equivalent capacity to the affected plant (or the nearest alternative) will be installed as a replacement to the affected plant. The duct(s) will be installed at standard depths of cover wherever possible. All new apparatus provided for the purposes of diversionary works will be installed as specified by Openreach's current engineering policies and practices. 1.2 Jointing Chambers and Manhole Construction New jointing chambers/manholes may be provided to connect the diversionary ducts to the existing (retained) network. The size and number of chambers may be dependent upon the number of ducts and their intended use. Openreach jointing chambers and manholes have Department of Transport approval. New apparatus provided for the purpose of diversionary works will be installed as specified in Openreach engineering policies and practices. 2 Cabling Works 2.1 Overhead Wires Where overhead wires, cables and associated suspension apparatus require diversion, replacement apparatus will be provided. The new apparatus will be installed in locations that are unaffected by the scheme and agreed with the Client. New apparatus provided for the purpose of diversionary works will be installed as specified in Openreach engineering policies and practices. 2.2 Underground Cables Where underground ducts and cable ducts are to be diverted, replacement cables will be installed into the new duct. The circuits affected by the construction of 900314 scheme include local distribution and optical fibre cables. 2.3 Recoveries On completion of the cable diversions, all redundant Openreach equipment (except underground ducts) will be recovered where possible. No allowance has been made for the recovery of redundant underground ducts as it has been assumed they will be recovered or demolished under the construction phase of the 900314 scheme and the associated works by the Client main contractor. All jointing chambers and manholes made spare by the diversionary works will be demolished by Openreach and will be charged for. 3. Off-Site Works The diversion of some cables and associated circuits (audio and digital trunk, coaxial, short haul data and fibre) will necessitate off-site works. These may include jointing and cabling works at locations other than those associated with the physical diversion and/or testing and balancing works at a telephone exchange or customer premises and will be charged for.
Published contracts in the last 12 months
231
total contracts
£831.5m
total value
£15,688,222
average contract size
ENQ1347 - Ice Rink for Festive Derby
Derby City Council · WAC-634845
ENQ1347 - Ice Rink for Festive Derby
Derby City Council · WAC-634395
TD2318 - Concessions Contract for the Operation of Derby City Council Markeaton Park Catering Outlets
Derby City Council · WAC-618690