Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Lancaster University |
| Main Category: | Services |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £475,000 |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
20 December 2022
Closed
Estimated Value
£475,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Release Date: |
| 22 November 2022 |
| Application Deadline: | 20 December 2022 |
| Procurement ID (OCID): | ocds-b5fd17-300c43de-b99c-4b43-bd99-490512cc32aa |
| Notice Reference: | b809f87e-95b2-4db6-b287-b257088a4d65-592232 |
All 2 notices for this procurement, oldest first.
Provision of the Delivery of Hot and Cold Water Monitoring and Inspection Services
Provision of the Delivery of Hot and Cold Water Monitoring and Inspection Services
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
To bid for this opportunity, please go to In Tend (https://in-tendhost.co.uk/lancaster/aspx/Home), download the EOI/Selection Stage documents, complete and return before the deadline. Lancaster University require the services of a competent Contractor to: • Deliver Hot and Cold-Water Monitoring and Inspection Services in accordance with HSE L8, HSG274, and the LCA Standard for the Delivery of Hot and Cold Water Monitoring and Inspection Services. • The findings, significance of results, and recommendations shall be recorded on Planon. • Assist the Safety and Compliance Manager as a competent person one day per month at Lancaster University Campus to evaluate the results of monitoring and inspection and recommend actions to control significant risks [The Reporter]. • Prepare a monthly report based upon Section 6 Verification and Control of the LCA Standards for Service Delivery [The Reporter]. • Carrying out the monitoring and inspection tasks and interpreting results [Technician]. The interpretation and communication of the results shall not be generic responses as the Client is seeking a competent evaluation of the risks and the control measures that provide the Client with reasonably practicable actions.
Published contracts in the last 12 months
4
total contracts
—
total value
—
average contract size
Typical categories