Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Gloucester City Council |
| Main Category: | Goods |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
18 February 2022
Closed
Estimated Value
£140,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £140,000 |
| Release Date: | 30 November 2022 |
| Application Deadline: | 18 February 2022 |
| Contract Start Date: | 31 May 2022 |
| Contract End Date: | 1 August 2022 |
| Contract Duration: | 2 months |
| Procurement ID (OCID): | ocds-b5fd17-476b2015-335c-47c4-9e5a-510c5fc8eeeb |
| Notice Reference: | 1dfa12fe-9c26-4400-8bd1-553b8fe5b9af-594612 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £140,000 |
| Award decision date: | 24 April 2022 |
| Award status: | Active |
To equip and carry out alterations to an existing workshop at the GL4 6PG depot to maintain the Gloucester City vehicle fleet in a modern, effective and efficient way. The main bulk of the works will be to: • supply and installation of a new 10 metre vehicle inspection pit; • supply and installation of an approved ATF 20 tonne air operated pit jack; • supply and installation of a commercial ATF approved 20 tonne commercial play detectors with remote wireless handset; • supply and installation of an ATF approved commercial vehicle roller brake tester (RBT) complete with hard standing testing area within 5% of level on approach to the RBT for 11 metres, including extending outside the building as necessary; • supply and installation of 6 wireless mobile column lifts (SWL 7,5T each lift); • Axle Stands for column lifts (SWL 7.5T); • supply and installation of 4 tonne two post vehicle lift; • supply and installation ATF approved commercial vehicle headlamp aligner with hard standing testing area within 5% of level, for a distance of at least 8.5 metres; • supply and installation 100 litre oil drainer; • Miscellaneous as per specification and pricing spreadsheet. Additional information: Documentation may be obtained at: https://www.supplyingthesouthwest.org.uk
Published contracts in the last 12 months
40
total contracts
£5.0m
total value
£313,700
average contract size
Typical categories