Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | BIP SOLUTIONS LIMITED |
| Main Category: | Services |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
29 March 2021
Closed
Estimated Value
£1
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £1 |
| Release Date: | 30 November 2022 |
| Application Deadline: | 29 March 2021 |
| Contract Start Date: | 2 May 2021 |
| Contract End Date: | 31 December 2021 |
| Contract Duration: | 8 months |
| Procurement ID (OCID): | ocds-b5fd17-d70d0edc-fdae-4dde-9992-310c31c53653 |
| Notice Reference: | 6b5b72e4-7f36-48a9-966a-bcaffb9d7551-593860 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £127,540 |
| Award decision date: | 29 July 2021 |
| Award status: | Active |
About the Opportunity: Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts, lots N1 and N2 under an Early Contractor Involvement contract (ECI). We are currently in stage one of a two stage process. We are looking to engage with the local supply chain whom provide surfacing works across multiple sites. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). Additional information: The scope of the subcontractor can be summarised in the following activities: • Quality check of the existing Primary PGMs. • The Staking of new Secondary PGMs following a setting-out drawing inside the delta Junction, it is approximately 60 points • The installation of new Secondary PGMs except where it will be decided to install pillars by Delta junction team • The measurement of the PGMs using Post Processed Kinematic techniques for X/Y and a double way levelling for Z connected to 1st order PGMs • Report including measurements and be in the form of Witness Diagrams of the Survey PGMs. Details of the Works to be Undertaken The Supplier shall undertake a Risk Assessment prior to each installation and ensure a Safe System of Work is in place before the works can proceed. Quality check of the Primary PGMs It will be necessary to control the points surrounding the Delta Junction (see figure 3) following the instruction HS2-HS2-GL-STR-000-000001 and HS2-HS2-GL-PRO-000-000003 PGM inspection and maintenance process and if need apply correction. The CORS stations will be fixed. The Primary PGM's newly calculated values will be compared to the issued values and communicated to the Client. The Primaries will then be fixed and the Secondary PGM's will then be calculated. Permanent Ground Markers (PGM) establishment was undertaken by Bridgeway Surveys (on behalf of High Speed 2 (HS2) in 2016 and 2018.
Published contracts in the last 12 months
207
total contracts
£4805.1m
total value
£24,768,327
average contract size
Typical categories
Dynamic Purchasing System (DPS) of Temporary Agency, Contractor and Interim Agencies for Preferred Supplier Listing - Y20010
BIP SOLUTIONS LIMITED · WAC-635342
Temporary Worker Agencies and Interim Contractors/Consultants for Preferred Supplier Listing Status for Dorset Unitary Council Y24006
BIP SOLUTIONS LIMITED · WAC-635293
Dynamic Purchasing System ("DPS") of Temporary Worker Agencies, and Interim Contractors/Consultants for Preferred Supplier Listing ("PSL") Status for Dudley Metropolitan Borough Council - Y23017
BIP SOLUTIONS LIMITED · WAC-635294