Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | BHCC City Regeneration and Development |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 19 March 2024 |
| Application Deadline: | 25 March 2021 |
| Procurement ID (OCID): | ocds-b5fd17-b2b6c6de-5f0a-4481-9b8a-b57eeab69351 |
| Notice Reference: | 305d8df8-aa56-43ed-9556-69263d179862-733364 |
View Original Notice
Access the full notice on the official portal
The Brighton Black Rock Sea Wall Realignment works, is part of the larger Black Rock Site Enabling and Public Realm Works commissioned to develop the Brighton Black Rock frontage. This specification is solely dedicated to the Coastal Sea Wall Realignment works. Site preliminaries apart from information relating to testing and sampling of materials covered by this specification will be provided in a separate document. All landward elements including promenade, drainage and landscape features are not part of this document. The works to be provided as part of the scheme include: 1. Construction of new concrete clad sheet pile wall approximately 215m long, tying into the Brighton Marina Harbour arm in the east and the existing seawall defences in the west. One bridging detail over an existing concrete groyne. 2. Demolishing existing seawall to a level of +2mOD. 3. Reinstatement of shingle beach adjacent to new seawall following construction works. 4. Installation of weep holes through new seawall.
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
25 March 2021
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →