Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | Diamond Light Source Ltd |
| Main Category: | Goods |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £0.01 |
| Release Date: | 31 July 2024 |
| Application Deadline: | 28 May 2024 |
| Procurement ID (OCID): | ocds-b5fd17-d2923c26-33b3-4ed8-85b1-5c1b496cf8a2 |
| Notice Reference: | 3b13d328-d8c0-4f3f-b1fb-8b3f583ef85f-772744 |
View Original Notice
Access the full notice on the official portal
Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the structure and behaviour of the world around us at the atomic and molecular level. To continue delivering the world-changing science that Diamond enables, the facility is being upgraded to Diamond-II, a co-ordinated programme of development that combines a major machine upgrade with new instruments and complementary improvements to optics, detectors, sample environment and delivery capabilities, and computing, as well as integrated and correlative methods. This will be transformative in speed and spatial resolution and will offer users streamlined access to enhanced instruments for life and physical sciences. A total of 50 girder assemblies are required of various types containing different combinations of dipole, quadrupole, sextupole and corrector magnets. The girder assemblies will include the UHV vacuum vessel assembly running through the magnet gaps, including Beam Position Monitors (BPM), bellows, flanges and all necessary vacuum pumps and instrumentation, as well as their support pedestals, adjustment system and baseplates. The booster will operate at 5 Hz repetition frequency and hence all magnets must be of a laminated construction. The girder assemblies must be designed and constructed so as to be able to be fitted together to form sections of the Diamond Booster synchrotron. The vacuum assemblies must be baked-out before integration in the magnets without venting and supplied under vacuum. The magnets and vacuum components are to be mounted and accurately aligned on the girders, complete with all service and interlock connections to suitable manifolds and electrical termination boards, by the Supplier, ready for installation. The Supplier will carry out full mechanical, electrical and magnetic testing of the individual magnetic elements, vacuum tests to ensure UHV compatibility, as well as other tests of components and complete assemblies. To apply visit our website which requires suppliers to complete a one-off simple registration form, which will generate a unique password for your account. You are then able to login to register your interest against the Tender and download the tender documents. Link to the site: https://tenders.diamond.ac.uk/Home.aspx
Published contracts in the last 12 months
10
total contracts
£0k
total value
£0
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
28 May 2024
Closed
Estimated Value
£0.01
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →