Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Northern Lighthouse Board |
| Main Category: | Works |
| Procurement Method: | Not specified |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £228,943.99 |
| Release Date: | 16 August 2024 |
| Application Deadline: | 7 August 2024 |
| Contract Start Date: | 11 August 2024 |
| Contract End Date: | 31 March 2025 |
| Contract Duration: | 8 months |
| Procurement ID (OCID): | ocds-b5fd17-e3897736-708f-4556-a808-727af408d4a5 |
| Notice Reference: | 780b57a3-3d13-41be-bd29-c85a7caf85fd-778186 |
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award value: | £228,943.99 |
| Award decision date: | 7 August 2024 |
| Award status: | Active |
Description: Painting and glazing work. Electrical installation work. Concrete repair work. Corsewall Lighthouse, Built in 1817, is Grade A Listed. The station is currently designated as road access for routine maintenance and Major works. The last major refurbishment occurred in 1994, with last Revenue Re-paint in 2014. The current AtoN is a Cat 1 Light with a 22 nautical mile range. The scope of the proposed Major upgrade project is summarised as follows: retain the existing Range and first order, Rotating Fresnel lens & mechanical bearing, replacing the existing light source with LED GRAD unit, controls, battery and monitoring with modern equivalents. Lightning & earthing infrastructure to be tested and upgraded as appropriate. Repairs required to masonry spiral stair & plasterwork, together with full redecoration internally & externally (including replacement of floor coverings as required). Cathodic Protection is proposed for cast iron window frames and other metalwork prone to corrosion. Investigate improvements to tower ventilation. Inspect all flat roofs & carry out repairs as required. Inspect & repair pointing to masonry of tower walls & balcony corbel. Various items of mitigation works are also proposed in connection with planned public access to the lighthouse (i.e. anti-climb measures & cable lay-overs on the tower balcony & rotating machinery encasement in the watch room etc).
Published contracts in the last 12 months
84
total contracts
£71.5m
total value
£1,374,926
average contract size
Typical categories
Refurbishment of Maughold Head and Douglas Head Lighthouses
Northern Lighthouse Board · WAC-639495
Ignition Supervisory Control and Data Acquisition (SCADA) Support
Northern Lighthouse Board · WAC-638456
RTU's and M2M Communications Management
Northern Lighthouse Board · WAC-630415
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
7 August 2024
Closed
Estimated Value
£228,943.99
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →